Pulp, Paper Mills & Corrugated Boxes VSM Scenarios
12 scenarios of Pulp, Paper Mills & Corrugated Boxes, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Pulping / Reel Slit & Fluting → 4-Color Flexo Printing → Rotary Die-Cut & Folder-Gluer → Compression & Moisture Check → Auto Strapper & Unitized Load. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| High-Speed Corrugated E-Commerce Box Line | 48,000 packs per day | 3 | 1.7 s | 7.60 d | 0.001% | Rotary Die-Cut & Scrap Vac |
| 900-Ton/Day Recycled Testliner Packaging Mill | 900 tonnes per day | 3 | 90.0 s | 7.60 d | 0.056% | Shoe Press & 48-Cylinder Dry |
| 3-Ply Virgin/Bamboo Toilet & Towel Converting | 36,000 packs per day | 3 | 2.3 s | 7.60 d | 0.001% | Accumulate & Dual Orbital Log Saw |
| 6-Pack Wet-Strength Beer Basket Carrier Carton | 42,000 packs per day | 2 | 1.3 s | 7.60 d | 0.002% | Flatbed Die-Cut & Strip |
| 100% Bagasse Molded Pulp Food Clamshell Line | 85,000 units per day | 3 | 1.0 s | 7.60 d | 0.001% | Hot-Press In-Mold Smooth Dry |
| Ultra-Thin 45gsm Miniature Pharma Outsert Line | 110,000 units per day | 3 | 0.7 s | 7.60 d | 0.001% | 32-Panel Cross & Glue Spot |
| Double-Wall Aqueous-Coated Disposable Paper Cup | 140,000 units per day | 3 | 0.6 s | 7.60 d | 0.001% | 160-cpm Ultrasonic Side/Bot |
| BPA-Free Thermal POS Receipt & Scale Roll Line | 54,000 packs per day | 2 | 1.0 s | 7.60 d | 0.001% | Pre-Print Brand Back Flexo |
| Watermark Cotton Paper & Hologram Security Sheet | 28,000 parts per day | 2 | 1.9 s | 7.60 d | 0.002% | Gelatin Surface Size & Calender |
| High-Humidity Wax-Free Export Citrus Box | 32,000 parts per day | 2 | 1.7 s | 7.60 d | 0.002% | Flatbed Heavy Vent Die-Cut |
| Custom Multi-Tier Printed Retail Floor Display | 850 units per day | 2 | 63.5 s | 7.60 d | 0.059% | Hot-Melt Hand/Jig Structural |
| Reinforced Fiberglass Water-Activated Gummed Tape | 24,000 packs per day | 2 | 2.3 s | 7.60 d | 0.002% | Multi-Pass Tunnel Steam Dry |