High-Humidity Wax-Free Export Citrus Box
Product family: Ventilated P84 Box Flats.
Flow: Heavy Kraftliner & Semichem → Heavy Twin-Arch Wet Corrugate → 4-Color Moisture Resistant Ink → Flatbed Heavy Vent Die-Cut → Tray-Form Glue Corner Test → Auto Strapped Export Bundles → Citrus & Berry Packhouses
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Heavy Twin-Arch Wet Corrugate | 1.2 s | 25 min | 94% | 98.8% | 32,000 | 41,600 (1.30 d) | 40,632 |
| 2. 4-Color Moisture Resistant Ink | 1.4 s | 40 min | 91% | 97.6% | 25,600 | 48,000 (1.50 d) | 32,354 |
| 3. Flatbed Heavy Vent Die-Cut | 1.8 s | 45 min | 84% | 95.8% | 25,600 | 57,600 (1.80 d) | 22,633 |
| 4. Tray-Form Glue Corner Test | 1.2 s | 5 min | 97% | 98.9% | 8,000 | 22,400 (0.70 d) | 42,211 |
| 5. Auto Strapped Export Bundles | 1.2 s | 8 min | 97% | 99.5% | 9,600 | 25,600 (0.80 d) | 42,145 |
Key figures
- Takt time
- 1.7 s
- Lead time
- 7.60 d
- Value-added time
- 6.8 s
- Process cycle efficiency (PCE)
- 0.002%
- Rolled throughput yield (RTY)
- 90.9%
- Customer demand per day
- 32,000 parts
- Line capacity per day
- 22,633 parts
- Bottleneck
- Flatbed Heavy Vent Die-Cut
Reading the bottleneck
The bottleneck is "Flatbed Heavy Vent Die-Cut": it can process 22,633 parts per day against a demand of 32,000 parts, so it falls short of demand by 29.3%. Once downtime and scrap are counted, its cycle time grows from 1.8 s to 2.2 s, against a takt of 1.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Pulp, Paper Mills & Corrugated Boxes: Pulp, Paper Mills & Corrugated Boxes
- High-Speed Corrugated E-Commerce Box Line
- 900-Ton/Day Recycled Testliner Packaging Mill
- 3-Ply Virgin/Bamboo Toilet & Towel Converting
- 6-Pack Wet-Strength Beer Basket Carrier Carton
- 100% Bagasse Molded Pulp Food Clamshell Line
- Ultra-Thin 45gsm Miniature Pharma Outsert Line
- Double-Wall Aqueous-Coated Disposable Paper Cup
- BPA-Free Thermal POS Receipt & Scale Roll Line
- Watermark Cotton Paper & Hologram Security Sheet
- Custom Multi-Tier Printed Retail Floor Display
- Reinforced Fiberglass Water-Activated Gummed Tape