High-Speed Corrugated E-Commerce Box Line

Product family: Die-Cut Self-Seal Tear Boxes.

Flow: Testliner & Fluting Paper Mill → Double-Facer Wet Corrugate → HD 4-Color Flexo Print Slot → Rotary Die-Cut & Scrap Vac → Double-Sided Peel-Seal Glue → Auto Strapper & Unit Pallet → Fulfillment & Retail Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Speed Corrugated E-Commerce Box LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Testliner & Fluting Paper Mill → Double-Facer Wet Corrugate (1.2 s) → HD 4-Color Flexo Print Slot (1.4 s) → Rotary Die-Cut & Scrap Vac (1.8 s) → Double-Sided Peel-Seal Glue (1.2 s) → Auto Strapper & Unit Pallet (1.2 s) → Fulfillment & Retail Hubs.SUPPLIERTestliner &Fluting PaperMillI1.30 d1Double-Facer WetCorrugateC/T 1.2 sI1.50 d2HD 4-Color FlexoPrint SlotC/T 1.4 sI1.80 d3Rotary Die-Cut &Scrap VacC/T 1.8 sI0.70 d4Double-SidedPeel-Seal GlueC/T 1.2 sI0.80 d5Auto Strapper &Unit PalletC/T 1.2 sI1.50 dCUSTOMERFulfillment &Retail Hubs48,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Double-Facer Wet Corrugate1.2 s25 min94%98.8%48,00062,400 (1.30 d)61,528
2. HD 4-Color Flexo Print Slot1.4 s40 min91%97.6%38,40072,000 (1.50 d)49,483
3. Rotary Die-Cut & Scrap Vac1.8 s45 min84%95.8%38,40086,400 (1.80 d)34,704
4. Double-Sided Peel-Seal Glue1.2 s5 min97%98.9%12,00033,600 (0.70 d)63,795
5. Auto Strapper & Unit Pallet1.2 s8 min97%99.5%14,40038,400 (0.80 d)63,861

Key figures

Takt time
1.7 s
Lead time
7.60 d
Value-added time
6.8 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
90.9%
Customer demand per day
48,000 packs
Line capacity per day
34,704 packs
Bottleneck
Rotary Die-Cut & Scrap Vac

Reading the bottleneck

The bottleneck is "Rotary Die-Cut & Scrap Vac": it can process 34,704 packs per day against a demand of 48,000 packs, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 1.8 s to 2.2 s, against a takt of 1.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.