Flexible Packaging, Labels & Luxury Print VSM Scenarios
12 scenarios of Flexible Packaging, Labels & Luxury Print, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Prepress Plates & Color Proof → 10-Color Gravure / CI Flexo → Solventless / UV Foil Laminate → Slitting, Die-Cut & 100% Vision → Rewind Core & Clean Box Pack. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 10-Color Solventless Retort Stand-Up Pouch | 65,000 packs per day | 3 | 1.2 s | 8.20 d | 0.001% | 10-Color CI Flexo Press Print |
| Automated Smyth-Sewn Hardcover Book Bindery | 18,000 units per day | 2 | 3.0 s | 8.20 d | 0.003% | Signature Fold & Collating |
| 360° Steam-Shrink PETG Full-Body Bottle Sleeve | 120,000 units per day | 3 | 0.7 s | 8.20 d | 0.001% | High-Speed Gravure Solvent Dry |
| UHF RFID Encoded Retail Apparel Smart Hangtag | 95,000 units per day | 2 | 0.6 s | 8.20 d | 0.001% | Offset Brand & Care Print |
| Digital Press + Rotary Emboss Wine Label | 75,000 units per day | 2 | 0.7 s | 8.20 d | 0.001% | Semi-Rotary Hot Foil & Emboss |
| Magnetic Flocked Luxury Watch & Perfume Gift Box | 12,000 units per day | 2 | 4.5 s | 8.20 d | 0.004% | Magnet Insert & Wrapped Paper |
| GMP Die-Cut Coated Spunbond Medical Sterile Lid | 85,000 parts per day | 3 | 1.0 s | 8.20 d | 0.001% | 2-Color Clean Medical Flexo |
| High-Speed 2-Piece Aluminum Beverage Can Deco | 240,000 units per day | 3 | 0.3 s | 8.20 d | 0.001% | 8-Color Dry Offset Decorator |
| Micro-Embossed Anti-Counterfeit Excise Tax Stamp | 180,000 units per day | 2 | 0.3 s | 8.20 d | 0.001% | Hot Foil Transfer Application |
| Variable-Data Targeted Retail Catalog Print Run | 32,000 units per day | 2 | 1.7 s | 8.20 d | 0.002% | High-Speed Inkjet Address/Offer |
| Compostable Cornstarch E-Commerce Mailer Bag | 65,000 packs per day | 2 | 0.8 s | 8.20 d | 0.001% | 6-Color Water-Based Print |
| Spiral-Wound Food-Safe Paper Canister Tube | 24,000 units per day | 2 | 2.3 s | 8.20 d | 0.002% | In-Line Printed Label Wrap |