GMP Die-Cut Coated Spunbond Medical Sterile Lid

Product family: Cleanroom Peelable Barrier Lids.

Flow: Spunbond Polyolefin Reels → ISO-7 Grid Lacquer Coating → 2-Color Clean Medical Flexo → Rotary Die-Cut & Air Eject → 100% Camera Gel/Dust Check → Double-Bagged Cleanroom Box → MedTech Blister Pack Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: GMP Die-Cut Coated Spunbond Medical Sterile LidSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Spunbond Polyolefin Reels → ISO-7 Grid Lacquer Coating (1.2 s) → 2-Color Clean Medical Flexo (1.2 s) → Rotary Die-Cut & Air Eject (1.2 s) → 100% Camera Gel/Dust Check (1.2 s) → Double-Bagged Cleanroom Box (1.2 s) → MedTech Blister Pack Plants.SUPPLIERSpunbondPolyolefinReelsI1.40 d1ISO-7 GridLacquer CoatingC/T 1.2 sI2.00 d22-Color CleanMedical FlexoC/T 1.2 sI1.50 d3Rotary Die-Cut &Air EjectC/T 1.2 sI1.00 d4100% CameraGel/Dust CheckC/T 1.2 sI0.80 d5Double-BaggedCleanroom BoxC/T 1.2 sI1.50 dCUSTOMERMedTech BlisterPack Plants85,000 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. ISO-7 Grid Lacquer Coating1.2 s20 min96%98.2%68,000119,000 (1.40 d)62,455
2. 2-Color Clean Medical Flexo1.2 s65 min84%95.4%85,000170,000 (2.00 d)51,487
3. Rotary Die-Cut & Air Eject1.2 s30 min91%97.8%68,000127,500 (1.50 d)58,405
4. 100% Camera Gel/Dust Check1.2 s15 min94%98.5%34,00085,000 (1.00 d)60,762
5. Double-Bagged Cleanroom Box1.2 s8 min97%99.4%25,50068,000 (0.80 d)63,797

Key figures

Takt time
1.0 s
Lead time
8.20 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
89.7%
Customer demand per day
85,000 parts
Line capacity per day
51,487 parts
Bottleneck
2-Color Clean Medical Flexo

Reading the bottleneck

The bottleneck is "2-Color Clean Medical Flexo": it can process 51,487 parts per day against a demand of 85,000 parts, so it falls short of demand by 39.4%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 1.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.