Spiral-Wound Food-Safe Paper Canister Tube

Product family: Aluminum Foil Lined Tea Cans.

Flow: Recycled Kraft & Liner Ply → 4-Ply Spiral Mandrel Winding → In-Line Printed Label Wrap → Precision Multi-Blade Tube Cut → Metal Base Double Seam Crimp → Peel-Off Foil Lid & Pack → Tea, Snacks & Spirits Brands

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Spiral-Wound Food-Safe Paper Canister TubeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Recycled Kraft & Liner Ply → 4-Ply Spiral Mandrel Winding (1.4 s) → In-Line Printed Label Wrap (2.4 s) → Precision Multi-Blade Tube Cut (1.8 s) → Metal Base Double Seam Crimp (1.7 s) → Peel-Off Foil Lid & Pack (1.2 s) → Tea, Snacks & Spirits Brands.SUPPLIERRecycled Kraft& Liner PlyI1.40 d14-Ply SpiralMandrel WindingC/T 1.4 sI2.00 d2In-Line PrintedLabel WrapC/T 2.4 sI1.50 d3PrecisionMulti-Blade Tube…C/T 1.8 sI1.00 d4Metal Base DoubleSeam CrimpC/T 1.7 sI0.80 d5Peel-Off Foil Lid& PackC/T 1.2 sI1.50 dCUSTOMERTea, Snacks &Spirits Brands24,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 4-Ply Spiral Mandrel Winding1.4 s20 min96%98.2%19,20033,600 (1.40 d)35,352
2. In-Line Printed Label Wrap2.4 s65 min84%95.4%24,00048,000 (2.00 d)16,728
3. Precision Multi-Blade Tube Cut1.8 s30 min91%97.8%19,20036,000 (1.50 d)25,587
4. Metal Base Double Seam Crimp1.7 s15 min94%98.5%9,60024,000 (1.00 d)28,185
5. Peel-Off Foil Lid & Pack1.2 s8 min97%99.4%7,20019,200 (0.80 d)42,103

Key figures

Takt time
2.3 s
Lead time
8.20 d
Value-added time
8.5 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
89.7%
Customer demand per day
24,000 units
Line capacity per day
16,728 units
Bottleneck
In-Line Printed Label Wrap

Reading the bottleneck

The bottleneck is "In-Line Printed Label Wrap": it can process 16,728 units per day against a demand of 24,000 units, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 2.4 s to 3.0 s, against a takt of 2.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.