Variable-Data Targeted Retail Catalog Print Run

Product family: Personalized Offset + Saddle.

Flow: 70gsm LWC Coated Reels → Heatset Web Offset Cover → High-Speed Inkjet Address/Offer → Automated Saddle-Stitch Line → 3-Knife Trim & Polywrap Mail → Postal Bag Sort by ZIP → Retail & Mail-Order Brands

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Variable-Data Targeted Retail Catalog Print RunSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 70gsm LWC Coated Reels → Heatset Web Offset Cover (1.2 s) → High-Speed Inkjet Address/Offer (1.8 s) → Automated Saddle-Stitch Line (1.4 s) → 3-Knife Trim & Polywrap Mail (1.2 s) → Postal Bag Sort by ZIP (1.2 s) → Retail & Mail-Order Brands.SUPPLIER70gsm LWCCoated ReelsI1.40 d1Heatset WebOffset CoverC/T 1.2 sI2.00 d2High-Speed InkjetAddress/OfferC/T 1.8 sI1.50 d3AutomatedSaddle-Stitch…C/T 1.4 sI1.00 d43-Knife Trim &Polywrap MailC/T 1.2 sI0.80 d5Postal Bag Sortby ZIPC/T 1.2 sI1.50 dCUSTOMERRetail &Mail-Order…32,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Heatset Web Offset Cover1.2 s20 min96%98.2%25,60044,800 (1.40 d)41,244
2. High-Speed Inkjet Address/Offer1.8 s65 min84%95.4%32,00064,000 (2.00 d)22,305
3. Automated Saddle-Stitch Line1.4 s30 min91%97.8%25,60048,000 (1.50 d)32,897
4. 3-Knife Trim & Polywrap Mail1.2 s15 min94%98.5%12,80032,000 (1.00 d)39,929
5. Postal Bag Sort by ZIP1.2 s8 min97%99.4%9,60025,600 (0.80 d)42,103

Key figures

Takt time
1.7 s
Lead time
8.20 d
Value-added time
6.8 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
89.7%
Customer demand per day
32,000 units
Line capacity per day
22,305 units
Bottleneck
High-Speed Inkjet Address/Offer

Reading the bottleneck

The bottleneck is "High-Speed Inkjet Address/Offer": it can process 22,305 units per day against a demand of 32,000 units, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 1.8 s to 2.2 s, against a takt of 1.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.