Digital Press + Rotary Emboss Wine Label

Product family: Short-Run Multi-SKU Wine Labels.

Flow: Textured Cotton Stock → 7-Color Digital Press Print → Semi-Rotary Hot Foil & Emboss → High-Build Tactile Screen Coat → Gap Sensor Die-Cut & Matrix → 100% Camera & Turret Rewind → Boutique & Estate Wineries

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Digital Press + Rotary Emboss Wine LabelSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Textured Cotton Stock → 7-Color Digital Press Print (1.2 s) → Semi-Rotary Hot Foil & Emboss (1.2 s) → High-Build Tactile Screen Coat (1.2 s) → Gap Sensor Die-Cut & Matrix (1.2 s) → 100% Camera & Turret Rewind (1.2 s) → Boutique & Estate Wineries.SUPPLIERTextured CottonStockI1.40 d17-Color DigitalPress PrintC/T 1.2 sI2.00 d2Semi-Rotary HotFoil & EmbossC/T 1.2 sI1.50 d3High-BuildTactile Screen…C/T 1.2 sI1.00 d4Gap SensorDie-Cut & MatrixC/T 1.2 sI0.80 d5100% Camera &Turret RewindC/T 1.2 sI1.50 dCUSTOMERBoutique &Estate Wineries75,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 7-Color Digital Press Print1.2 s20 min96%98.2%60,000105,000 (1.40 d)41,244
2. Semi-Rotary Hot Foil & Emboss1.2 s65 min84%95.4%75,000150,000 (2.00 d)33,457
3. High-Build Tactile Screen Coat1.2 s30 min91%97.8%60,000112,500 (1.50 d)38,380
4. Gap Sensor Die-Cut & Matrix1.2 s15 min94%98.5%30,00075,000 (1.00 d)39,929
5. 100% Camera & Turret Rewind1.2 s8 min97%99.4%22,50060,000 (0.80 d)42,103

Key figures

Takt time
0.7 s
Lead time
8.20 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
89.7%
Customer demand per day
75,000 units
Line capacity per day
33,457 units
Bottleneck
Semi-Rotary Hot Foil & Emboss

Reading the bottleneck

The bottleneck is "Semi-Rotary Hot Foil & Emboss": it can process 33,457 units per day against a demand of 75,000 units, so it falls short of demand by 55.4%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 0.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.