UHF RFID Encoded Retail Apparel Smart Hangtag

Product family: Serialized EPC Gen2 Hangtags.

Flow: UHF RFID Inlays → Wet Inlay High-Speed Insert → Offset Brand & Care Print → Rotary Die & Hole String Punch → UHF EPC Encode & Read Verify → Bundled Store Box Traceable → Global Fast-Fashion Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: UHF RFID Encoded Retail Apparel Smart HangtagSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. UHF RFID Inlays → Wet Inlay High-Speed Insert (1.2 s) → Offset Brand & Care Print (1.2 s) → Rotary Die & Hole String Punch (1.2 s) → UHF EPC Encode & Read Verify (1.2 s) → Bundled Store Box Traceable (1.2 s) → Global Fast-Fashion Chains.SUPPLIERUHF RFID InlaysI1.40 d1Wet InlayHigh-Speed InsertC/T 1.2 sI2.00 d2Offset Brand &Care PrintC/T 1.2 sI1.50 d3Rotary Die & HoleString PunchC/T 1.2 sI1.00 d4UHF EPC Encode &Read VerifyC/T 1.2 sI0.80 d5Bundled Store BoxTraceableC/T 1.2 sI1.50 dCUSTOMERGlobalFast-Fashion…95,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Wet Inlay High-Speed Insert1.2 s20 min96%98.2%76,000133,000 (1.40 d)41,244
2. Offset Brand & Care Print1.2 s65 min84%95.4%95,000190,000 (2.00 d)33,457
3. Rotary Die & Hole String Punch1.2 s30 min91%97.8%76,000142,500 (1.50 d)38,380
4. UHF EPC Encode & Read Verify1.2 s15 min94%98.5%38,00095,000 (1.00 d)39,929
5. Bundled Store Box Traceable1.2 s8 min97%99.4%28,50076,000 (0.80 d)42,103

Key figures

Takt time
0.6 s
Lead time
8.20 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
89.7%
Customer demand per day
95,000 units
Line capacity per day
33,457 units
Bottleneck
Offset Brand & Care Print

Reading the bottleneck

The bottleneck is "Offset Brand & Care Print": it can process 33,457 units per day against a demand of 95,000 units, so it falls short of demand by 64.8%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 0.6 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.