High-Speed 2-Piece Aluminum Beverage Can Deco
Product family: Dry-Offset 8-Color Can Prints.
Flow: Al Coil Stock 3104 Alloy → Cup & Wall Ironer Bodymaker → 8-Color Dry Offset Decorator → Pin-Chain Gas Cure & Internal → Necking Spin & Flange Form → 100% Vision Light Tester & Pal → Global Beverage Fillers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Cup & Wall Ironer Bodymaker | 1.2 s | 20 min | 96% | 98.2% | 192,000 | 336,000 (1.40 d) | 62,455 |
| 2. 8-Color Dry Offset Decorator | 1.2 s | 65 min | 84% | 95.4% | 240,000 | 480,000 (2.00 d) | 51,487 |
| 3. Pin-Chain Gas Cure & Internal | 1.2 s | 30 min | 91% | 97.8% | 192,000 | 360,000 (1.50 d) | 58,405 |
| 4. Necking Spin & Flange Form | 1.2 s | 15 min | 94% | 98.5% | 96,000 | 240,000 (1.00 d) | 60,762 |
| 5. 100% Vision Light Tester & Pal | 1.2 s | 8 min | 97% | 99.4% | 72,000 | 192,000 (0.80 d) | 63,797 |
Key figures
- Takt time
- 0.3 s
- Lead time
- 8.20 d
- Value-added time
- 6.0 s
- Process cycle efficiency (PCE)
- 0.001%
- Rolled throughput yield (RTY)
- 89.7%
- Customer demand per day
- 240,000 units
- Line capacity per day
- 51,487 units
- Bottleneck
- 8-Color Dry Offset Decorator
Reading the bottleneck
The bottleneck is "8-Color Dry Offset Decorator": it can process 51,487 units per day against a demand of 240,000 units, so it falls short of demand by 78.5%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 0.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Flexible Packaging, Labels & Luxury Print: Flexible Packaging, Labels & Luxury Print
- 10-Color Solventless Retort Stand-Up Pouch
- Automated Smyth-Sewn Hardcover Book Bindery
- 360° Steam-Shrink PETG Full-Body Bottle Sleeve
- UHF RFID Encoded Retail Apparel Smart Hangtag
- Digital Press + Rotary Emboss Wine Label
- Magnetic Flocked Luxury Watch & Perfume Gift Box
- GMP Die-Cut Coated Spunbond Medical Sterile Lid
- Micro-Embossed Anti-Counterfeit Excise Tax Stamp
- Variable-Data Targeted Retail Catalog Print Run
- Compostable Cornstarch E-Commerce Mailer Bag
- Spiral-Wound Food-Safe Paper Canister Tube