10-Color Solventless Retort Stand-Up Pouch

Product family: High-Barrier Barrier Laminates.

Flow: PET, Nylon & Al Foil Reels → Cylinder Prepress & Color Match → 10-Color CI Flexo Press Print → Solventless Lamination → 24h Cure & Pouch Zipper Seal → 100% Vision & Burst Test → Food & Pet Food Fillers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 10-Color Solventless Retort Stand-Up PouchSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. PET, Nylon & Al Foil Reels → Cylinder Prepress & Color Match (1.2 s) → 10-Color CI Flexo Press Print (1.3 s) → Solventless Lamination (1.2 s) → 24h Cure & Pouch Zipper Seal (1.2 s) → 100% Vision & Burst Test (1.2 s) → Food & Pet Food Fillers.SUPPLIERPET, Nylon & AlFoil ReelsI1.40 d1Cylinder Prepress& Color MatchC/T 1.2 sI2.00 d210-Color CI FlexoPress PrintC/T 1.3 sI1.50 d3SolventlessLaminationC/T 1.2 sI1.00 d424h Cure & PouchZipper SealC/T 1.2 sI0.80 d5100% Vision &Burst TestC/T 1.2 sI1.50 dCUSTOMERFood & Pet FoodFillers65,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cylinder Prepress & Color Match1.2 s20 min96%98.2%52,00091,000 (1.40 d)62,455
2. 10-Color CI Flexo Press Print1.3 s65 min84%95.4%65,000130,000 (2.00 d)47,527
3. Solventless Lamination1.2 s30 min91%97.8%52,00097,500 (1.50 d)58,405
4. 24h Cure & Pouch Zipper Seal1.2 s15 min94%98.5%26,00065,000 (1.00 d)60,762
5. 100% Vision & Burst Test1.2 s8 min97%99.4%19,50052,000 (0.80 d)63,797

Key figures

Takt time
1.2 s
Lead time
8.20 d
Value-added time
6.1 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
89.7%
Customer demand per day
65,000 packs
Line capacity per day
47,527 packs
Bottleneck
10-Color CI Flexo Press Print

Reading the bottleneck

The bottleneck is "10-Color CI Flexo Press Print": it can process 47,527 packs per day against a demand of 65,000 packs, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 1.3 s to 1.6 s, against a takt of 1.2 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.