Magnetic Flocked Luxury Watch & Perfume Gift Box

Product family: Automated Wrapped Rigid Boxes.

Flow: 2mm Greyboard → V-Groove Board Die-Cut & Tape → Magnet Insert & Wrapped Paper → EVA / Molded Pulp Foam Drop-In → Hot Foil Lid Stamp & Ribbon → Cosmetic Visual & Nested Ship → Prestige Beauty & Watches

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Magnetic Flocked Luxury Watch & Perfume Gift BoxSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 2mm Greyboard → V-Groove Board Die-Cut & Tape (2.9 s) → Magnet Insert & Wrapped Paper (4.8 s) → EVA / Molded Pulp Foam Drop-In (3.6 s) → Hot Foil Lid Stamp & Ribbon (3.3 s) → Cosmetic Visual & Nested Ship (2.4 s) → Prestige Beauty & Watches.SUPPLIER2mm GreyboardI1.40 d1V-Groove BoardDie-Cut & TapeC/T 2.9 sI2.00 d2Magnet Insert &Wrapped PaperC/T 4.8 sI1.50 d3EVA / Molded PulpFoam Drop-InC/T 3.6 sI1.00 d4Hot Foil LidStamp & RibbonC/T 3.3 sI0.80 d5Cosmetic Visual &Nested ShipC/T 2.4 sI1.50 dCUSTOMERPrestige Beauty& Watches12,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. V-Groove Board Die-Cut & Tape2.9 s20 min96%98.2%9,60016,800 (1.40 d)17,066
2. Magnet Insert & Wrapped Paper4.8 s65 min84%95.4%12,00024,000 (2.00 d)8,364
3. EVA / Molded Pulp Foam Drop-In3.6 s30 min91%97.8%9,60018,000 (1.50 d)12,793
4. Hot Foil Lid Stamp & Ribbon3.3 s15 min94%98.5%4,80012,000 (1.00 d)14,520
5. Cosmetic Visual & Nested Ship2.4 s8 min97%99.4%3,6009,600 (0.80 d)21,051

Key figures

Takt time
4.5 s
Lead time
8.20 d
Value-added time
17.0 s
Process cycle efficiency (PCE)
0.004%
Rolled throughput yield (RTY)
89.7%
Customer demand per day
12,000 units
Line capacity per day
8,364 units
Bottleneck
Magnet Insert & Wrapped Paper

Reading the bottleneck

The bottleneck is "Magnet Insert & Wrapped Paper": it can process 8,364 units per day against a demand of 12,000 units, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 4.8 s to 6.0 s, against a takt of 4.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.