Compostable Cornstarch E-Commerce Mailer Bag
Product family: Twin-Track Returnable Poly Mailer.
Flow: Bio-Compound Starch Blend → 3-Layer Bio-Film Extrude → 6-Color Water-Based Print → Twin Hot-Melt Strip & Tear → Servo Bottom Seal & Wicketing → Barcode Count & Boxed Roll → Sustainable Fashion E-Tailers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 3-Layer Bio-Film Extrude | 1.2 s | 20 min | 96% | 98.2% | 52,000 | 91,000 (1.40 d) | 41,244 |
| 2. 6-Color Water-Based Print | 1.2 s | 65 min | 84% | 95.4% | 65,000 | 130,000 (2.00 d) | 33,457 |
| 3. Twin Hot-Melt Strip & Tear | 1.2 s | 30 min | 91% | 97.8% | 52,000 | 97,500 (1.50 d) | 38,380 |
| 4. Servo Bottom Seal & Wicketing | 1.2 s | 15 min | 94% | 98.5% | 26,000 | 65,000 (1.00 d) | 39,929 |
| 5. Barcode Count & Boxed Roll | 1.2 s | 8 min | 97% | 99.4% | 19,500 | 52,000 (0.80 d) | 42,103 |
Key figures
- Takt time
- 0.8 s
- Lead time
- 8.20 d
- Value-added time
- 6.0 s
- Process cycle efficiency (PCE)
- 0.001%
- Rolled throughput yield (RTY)
- 89.7%
- Customer demand per day
- 65,000 packs
- Line capacity per day
- 33,457 packs
- Bottleneck
- 6-Color Water-Based Print
Reading the bottleneck
The bottleneck is "6-Color Water-Based Print": it can process 33,457 packs per day against a demand of 65,000 packs, so it falls short of demand by 48.5%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 0.8 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Flexible Packaging, Labels & Luxury Print: Flexible Packaging, Labels & Luxury Print
- 10-Color Solventless Retort Stand-Up Pouch
- Automated Smyth-Sewn Hardcover Book Bindery
- 360° Steam-Shrink PETG Full-Body Bottle Sleeve
- UHF RFID Encoded Retail Apparel Smart Hangtag
- Digital Press + Rotary Emboss Wine Label
- Magnetic Flocked Luxury Watch & Perfume Gift Box
- GMP Die-Cut Coated Spunbond Medical Sterile Lid
- High-Speed 2-Piece Aluminum Beverage Can Deco
- Micro-Embossed Anti-Counterfeit Excise Tax Stamp
- Variable-Data Targeted Retail Catalog Print Run
- Spiral-Wound Food-Safe Paper Canister Tube