Pad-Steam Continuous Reactive Cotton Dye Range

Product family: Zero-Discharge Knit & Woven.

Flow: Bleached Greige Fabric Rolls → Enzymatic Desize & Bleach → High-Pressure Dye Pad Mangle → Saturated Steam Fixation → 5-Box Wash & Stenter Heat → Spectrophotometer Delta-E<0.6 → Apparel Garment Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Pad-Steam Continuous Reactive Cotton Dye RangeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Bleached Greige Fabric Rolls → Enzymatic Desize & Bleach (1,090 s) → High-Pressure Dye Pad Mangle (1,308 s) → Saturated Steam Fixation (1,682 s) → 5-Box Wash & Stenter Heat (1,184 s) → Spectrophotometer Delta-E<0.6 (872 s) → Apparel Garment Hubs.SUPPLIERBleached GreigeFabric RollsI1.60 d1Enzymatic Desize& BleachC/T 1,090 sI1.81 d2High-Pressure DyePad MangleC/T 1,308 sI2.19 d3Saturated SteamFixationC/T 1,682 sI1.19 d45-Box Wash &Stenter HeatC/T 1,184 sI0.90 d5SpectrophotometerDelta-E<0.6C/T 872 sI1.81 dCUSTOMERApparel GarmentHubs52 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Enzymatic Desize & Bleach1,090 s35 min94%98.8%7883 (1.60 d)68
2. High-Pressure Dye Pad Mangle1,308 s55 min90%97.4%7894 (1.81 d)53
3. Saturated Steam Fixation1,682 s60 min84%94.8%62114 (2.19 d)37
4. 5-Box Wash & Stenter Heat1,184 s25 min93%98.2%3162 (1.19 d)61
5. Spectrophotometer Delta-E<0.6872 s10 min97%99.1%2147 (0.90 d)88

Key figures

Takt time
1,558 s
Lead time
9.58 d
Value-added time
6,136 s
Process cycle efficiency (PCE)
0.79%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
52 tonnes
Line capacity per day
37 tonnes
Bottleneck
Saturated Steam Fixation

Reading the bottleneck

The bottleneck is "Saturated Steam Fixation": it can process 37 tonnes per day against a demand of 52 tonnes, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 1,682 s to 2,112 s, against a takt of 1,558 s. The largest loss at this step is equipment downtime (uptime 84%), about 320 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.