1200g High-Tensile Geosynthetic Drainage Felt
Product family: Landfill & Road Stabilization.
Flow: UV-Stabilized Virgin PP Fiber → Carding & Broad Cross-Lapping → Heavy Multi-Board Needleloom → Heat Calender Thermal Bond → Edge Meter Stamp & Wide Roll → CBR Puncture & Tensile QC → Civil Highway Contractors
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Carding & Broad Cross-Lapping | 597 s | 35 min | 94% | 98.8% | 143 | 152 (1.60 d) | 124 |
| 2. Heavy Multi-Board Needleloom | 716 s | 55 min | 90% | 97.4% | 143 | 171 (1.80 d) | 96 |
| 3. Heat Calender Thermal Bond | 921 s | 60 min | 84% | 94.8% | 114 | 209 (2.20 d) | 67 |
| 4. Edge Meter Stamp & Wide Roll | 648 s | 25 min | 93% | 98.2% | 57 | 114 (1.20 d) | 111 |
| 5. CBR Puncture & Tensile QC | 477 s | 10 min | 97% | 99.1% | 38 | 86 (0.91 d) | 160 |
Key figures
- Takt time
- 853 s
- Lead time
- 9.55 d
- Value-added time
- 3,359 s
- Process cycle efficiency (PCE)
- 0.43%
- Rolled throughput yield (RTY)
- 88.8%
- Customer demand per day
- 95 tonnes
- Line capacity per day
- 67 tonnes
- Bottleneck
- Heat Calender Thermal Bond
Reading the bottleneck
The bottleneck is "Heat Calender Thermal Bond": it can process 67 tonnes per day against a demand of 95 tonnes, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 921 s to 1,157 s, against a takt of 853 s. The largest loss at this step is equipment downtime (uptime 84%), about 175 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Spinning, Weaving, Dyeing & Tech Textiles: Spinning, Weaving, Dyeing & Tech Textiles
- 100-Ton/Day Combed Ring-Spun Organic Cotton Mill
- Rope-Dyed Indigo & Air-Jet Shuttleless Denim Mill
- Pad-Steam Continuous Reactive Cotton Dye Range
- Meta-Aramid Firefighter Turnout Outer Shell Roll
- Triple-Beam SMS Non-Woven Hygiene Fabric Roll
- Unidirectional Wind-Spar Carbon Tow Prepreg Line
- Needlepunch Recycled PET Automotive Trunk Felt
- Split-Bicomponent Warp-Knit Microfiber Roll
- Closed-Loop NMMO Lyocell Regenerated Cellulosic
- X-Ray Detectable Bleached Cotton Lap Sponge
- 2116 Electrical-Grade Woven E-Glass Fabric Roll