Rope-Dyed Indigo & Air-Jet Shuttleless Denim Mill
Product family: 12oz Selvedge & Stretch Twill.
Flow: Open-End / Ring Slub Yarns → Ball Warping & Rope Indigo Vat → Sizing & Beaming Loom Prep → 400-PPM Air-Jet Weaving → Singeing, Wash & Shrink-Proof → 4-Point Laser Roll Map → Global Denim Cut-Sew Plants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Ball Warping & Rope Indigo Vat | 872 s | 35 min | 94% | 98.8% | 98 | 104 (1.60 d) | 85 |
| 2. Sizing & Beaming Loom Prep | 1,047 s | 55 min | 90% | 97.4% | 98 | 117 (1.80 d) | 66 |
| 3. 400-PPM Air-Jet Weaving | 1,346 s | 60 min | 84% | 94.8% | 78 | 143 (2.20 d) | 46 |
| 4. Singeing, Wash & Shrink-Proof | 947 s | 25 min | 93% | 98.2% | 39 | 78 (1.20 d) | 76 |
| 5. 4-Point Laser Roll Map | 698 s | 10 min | 97% | 99.1% | 26 | 59 (0.91 d) | 109 |
Key figures
- Takt time
- 1,246 s
- Lead time
- 9.57 d
- Value-added time
- 4,910 s
- Process cycle efficiency (PCE)
- 0.63%
- Rolled throughput yield (RTY)
- 88.8%
- Customer demand per day
- 65 batches
- Line capacity per day
- 46 batches
- Bottleneck
- 400-PPM Air-Jet Weaving
Reading the bottleneck
The bottleneck is "400-PPM Air-Jet Weaving": it can process 46 batches per day against a demand of 65 batches, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 1,346 s to 1,690 s, against a takt of 1,246 s. The largest loss at this step is equipment downtime (uptime 84%), about 256 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Spinning, Weaving, Dyeing & Tech Textiles: Spinning, Weaving, Dyeing & Tech Textiles
- 100-Ton/Day Combed Ring-Spun Organic Cotton Mill
- Pad-Steam Continuous Reactive Cotton Dye Range
- Meta-Aramid Firefighter Turnout Outer Shell Roll
- Triple-Beam SMS Non-Woven Hygiene Fabric Roll
- Unidirectional Wind-Spar Carbon Tow Prepreg Line
- Needlepunch Recycled PET Automotive Trunk Felt
- Split-Bicomponent Warp-Knit Microfiber Roll
- 1200g High-Tensile Geosynthetic Drainage Felt
- Closed-Loop NMMO Lyocell Regenerated Cellulosic
- X-Ray Detectable Bleached Cotton Lap Sponge
- 2116 Electrical-Grade Woven E-Glass Fabric Roll