Triple-Beam SMS Non-Woven Hygiene Fabric Roll

Product family: Medical & Diaper Barrier Webs.

Flow: High-MFI PP Pellets Producer → SSMMS Meltblown & Spin → Hot-Emboss Thermal Calender → Hydrophilic / Repellent Treat → Ultrasonic Edge Slit & Wind → Barrier Pressure QC → Surgical Gown & Diaper Lines

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Triple-Beam SMS Non-Woven Hygiene Fabric RollSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. High-MFI PP Pellets Producer → SSMMS Meltblown & Spin (515 s) → Hot-Emboss Thermal Calender (619 s) → Hydrophilic / Repellent Treat (795 s) → Ultrasonic Edge Slit & Wind (560 s) → Barrier Pressure QC (412 s) → Surgical Gown & Diaper Lines.SUPPLIERHigh-MFI PPPelletsProducerI1.60 d1SSMMS Meltblown &SpinC/T 515 sI1.80 d2Hot-EmbossThermal CalenderC/T 619 sI2.20 d3Hydrophilic /Repellent TreatC/T 795 sI1.20 d4Ultrasonic EdgeSlit & WindC/T 560 sI0.90 d5Barrier PressureQCC/T 412 sI1.80 dCUSTOMERSurgical Gown &Diaper Lines110 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. SSMMS Meltblown & Spin515 s35 min94%98.8%165176 (1.60 d)144
2. Hot-Emboss Thermal Calender619 s55 min90%97.4%165198 (1.80 d)112
3. Hydrophilic / Repellent Treat795 s60 min84%94.8%132242 (2.20 d)78
4. Ultrasonic Edge Slit & Wind560 s25 min93%98.2%66132 (1.20 d)128
5. Barrier Pressure QC412 s10 min97%99.1%4499 (0.90 d)185

Key figures

Takt time
736 s
Lead time
9.54 d
Value-added time
2,901 s
Process cycle efficiency (PCE)
0.38%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
110 tonnes
Line capacity per day
78 tonnes
Bottleneck
Hydrophilic / Repellent Treat

Reading the bottleneck

The bottleneck is "Hydrophilic / Repellent Treat": it can process 78 tonnes per day against a demand of 110 tonnes, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 795 s to 998 s, against a takt of 736 s. The largest loss at this step is equipment downtime (uptime 84%), about 151 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.