2116 Electrical-Grade Woven E-Glass Fabric Roll

Product family: Silane-Finished FR4 PCB Cloth.

Flow: E-Glass Fiber Bobbins → Air-Jet Glass Filament Weave → Heat Cleaning Size Burn-Off → Epoxy-Silane Wet Finish Coat → Precision Stenter Tension Cure → Optical Fuzz & Yarn Count QC → Copper-Clad Laminate Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 2116 Electrical-Grade Woven E-Glass Fabric RollSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. E-Glass Fiber Bobbins → Air-Jet Glass Filament Weave (834 s) → Heat Cleaning Size Burn-Off (1,001 s) → Epoxy-Silane Wet Finish Coat (1,286 s) → Precision Stenter Tension Cure (905 s) → Optical Fuzz & Yarn Count QC (667 s) → Copper-Clad Laminate Plants.SUPPLIERE-Glass FiberBobbinsI1.60 d1Air-Jet GlassFilament WeaveC/T 834 sI1.79 d2Heat CleaningSize Burn-OffC/T 1,001 sI2.21 d3Epoxy-Silane WetFinish CoatC/T 1,286 sI1.21 d4Precision StenterTension CureC/T 905 sI0.90 d5Optical Fuzz &Yarn Count QCC/T 667 sI1.79 dCUSTOMERCopper-CladLaminate Plants68 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Air-Jet Glass Filament Weave834 s35 min94%98.8%102109 (1.60 d)89
2. Heat Cleaning Size Burn-Off1,001 s55 min90%97.4%102122 (1.79 d)69
3. Epoxy-Silane Wet Finish Coat1,286 s60 min84%94.8%82150 (2.21 d)48
4. Precision Stenter Tension Cure905 s25 min93%98.2%4182 (1.21 d)79
5. Optical Fuzz & Yarn Count QC667 s10 min97%99.1%2761 (0.90 d)115

Key figures

Takt time
1,191 s
Lead time
9.56 d
Value-added time
4,693 s
Process cycle efficiency (PCE)
0.61%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
68 batches
Line capacity per day
48 batches
Bottleneck
Epoxy-Silane Wet Finish Coat

Reading the bottleneck

The bottleneck is "Epoxy-Silane Wet Finish Coat": it can process 48 batches per day against a demand of 68 batches, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 1,286 s to 1,615 s, against a takt of 1,191 s. The largest loss at this step is equipment downtime (uptime 84%), about 245 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Spinning, Weaving, Dyeing & Tech Textiles: Spinning, Weaving, Dyeing & Tech Textiles