Meta-Aramid Firefighter Turnout Outer Shell Roll

Product family: Ripstop EN-469 Heat Cloth.

Flow: Aramid Spun Yarn Producer → Static-Free Beaming & Size → Rigid Rapier Weaving → Fluoro-Free DWR Dip & Cure → Scour & Calender Densify → ISO 15025 Flame Lot Release → Firefighter PPE Makers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Meta-Aramid Firefighter Turnout Outer Shell RollSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aramid Spun Yarn Producer → Static-Free Beaming & Size (1,112 s) → Rigid Rapier Weaving (1,334 s) → Fluoro-Free DWR Dip & Cure (1,715 s) → Scour & Calender Densify (1,207 s) → ISO 15025 Flame Lot Release (889 s) → Firefighter PPE Makers.SUPPLIERAramid SpunYarn ProducerI1.59 d1Static-FreeBeaming & SizeC/T 1,112 sI1.79 d2Rigid RapierWeavingC/T 1,334 sI2.21 d3Fluoro-Free DWRDip & CureC/T 1,715 sI1.21 d4Scour & CalenderDensifyC/T 1,207 sI0.91 d5ISO 15025 FlameLot ReleaseC/T 889 sI1.79 dCUSTOMERFirefighter PPEMakers34 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Static-Free Beaming & Size1,112 s35 min94%98.8%5154 (1.59 d)44
2. Rigid Rapier Weaving1,334 s55 min90%97.4%5161 (1.79 d)34
3. Fluoro-Free DWR Dip & Cure1,715 s60 min84%94.8%4175 (2.21 d)24
4. Scour & Calender Densify1,207 s25 min93%98.2%2041 (1.21 d)39
5. ISO 15025 Flame Lot Release889 s10 min97%99.1%1431 (0.91 d)57

Key figures

Takt time
1,588 s
Lead time
9.62 d
Value-added time
6,257 s
Process cycle efficiency (PCE)
1.2%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
34 batches
Line capacity per day
24 batches
Bottleneck
Fluoro-Free DWR Dip & Cure

Reading the bottleneck

The bottleneck is "Fluoro-Free DWR Dip & Cure": it can process 24 batches per day against a demand of 34 batches, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 1,715 s to 2,154 s, against a takt of 1,588 s. The largest loss at this step is equipment downtime (uptime 84%), about 327 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.