Closed-Loop NMMO Lyocell Regenerated Cellulosic
Product family: Eucalyptus Sustainable Filament.
Flow: FSC Eucalyptus Dissolving Pulp → Shred Pulp & NMMO Vacuum Diss → Dry-Jet Wet Spin Air Gap → Solvent Recovery Wash Cascade → Finish Bath, Crimp & Cut Tow → Bale Press & Tenacity Lab → Fashion & Home Bedding Mills
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Shred Pulp & NMMO Vacuum Diss | 709 s | 35 min | 94% | 98.8% | 120 | 128 (1.60 d) | 104 |
| 2. Dry-Jet Wet Spin Air Gap | 851 s | 55 min | 90% | 97.4% | 120 | 144 (1.80 d) | 81 |
| 3. Solvent Recovery Wash Cascade | 1,094 s | 60 min | 84% | 94.8% | 96 | 176 (2.20 d) | 57 |
| 4. Finish Bath, Crimp & Cut Tow | 770 s | 25 min | 93% | 98.2% | 48 | 96 (1.20 d) | 93 |
| 5. Bale Press & Tenacity Lab | 567 s | 10 min | 97% | 99.1% | 32 | 72 (0.90 d) | 135 |
Key figures
- Takt time
- 1,013 s
- Lead time
- 9.55 d
- Value-added time
- 3,991 s
- Process cycle efficiency (PCE)
- 0.52%
- Rolled throughput yield (RTY)
- 88.8%
- Customer demand per day
- 80 tonnes
- Line capacity per day
- 57 tonnes
- Bottleneck
- Solvent Recovery Wash Cascade
Reading the bottleneck
The bottleneck is "Solvent Recovery Wash Cascade": it can process 57 tonnes per day against a demand of 80 tonnes, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 1,094 s to 1,374 s, against a takt of 1,013 s. The largest loss at this step is equipment downtime (uptime 84%), about 208 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Spinning, Weaving, Dyeing & Tech Textiles: Spinning, Weaving, Dyeing & Tech Textiles
- 100-Ton/Day Combed Ring-Spun Organic Cotton Mill
- Rope-Dyed Indigo & Air-Jet Shuttleless Denim Mill
- Pad-Steam Continuous Reactive Cotton Dye Range
- Meta-Aramid Firefighter Turnout Outer Shell Roll
- Triple-Beam SMS Non-Woven Hygiene Fabric Roll
- Unidirectional Wind-Spar Carbon Tow Prepreg Line
- Needlepunch Recycled PET Automotive Trunk Felt
- Split-Bicomponent Warp-Knit Microfiber Roll
- 1200g High-Tensile Geosynthetic Drainage Felt
- X-Ray Detectable Bleached Cotton Lap Sponge
- 2116 Electrical-Grade Woven E-Glass Fabric Roll