Unidirectional Wind-Spar Carbon Tow Prepreg Line

Product family: 600gsm Fast-Cure Epoxy Rolls.

Flow: Industrial 24K Carbon Bobbins → 120-Spool Precision Tension Creel → Epoxy Resin Film Reverse Coat → Heated Impregnation Compaction → Chill Drum & PE Backing → Freezer Roll -18°C Release → Wind Blade & Auto Preformers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Unidirectional Wind-Spar Carbon Tow Prepreg LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Industrial 24K Carbon Bobbins → 120-Spool Precision Tension Creel (1,350 s) → Epoxy Resin Film Reverse Coat (1,620 s) → Heated Impregnation Compaction (2,083 s) → Chill Drum & PE Backing (1,466 s) → Freezer Roll -18°C Release (1,080 s) → Wind Blade & Auto Preformers.SUPPLIERIndustrial 24KCarbon BobbinsI1.60 d1120-SpoolPrecision Tensio…C/T 1,350 sI1.81 d2Epoxy Resin FilmReverse CoatC/T 1,620 sI2.19 d3HeatedImpregnation…C/T 2,083 sI1.19 d4Chill Drum & PEBackingC/T 1,466 sI0.90 d5Freezer Roll-18°C ReleaseC/T 1,080 sI1.81 dCUSTOMERWind Blade &Auto Preformers42 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 120-Spool Precision Tension Creel1,350 s35 min94%98.8%6367 (1.60 d)55
2. Epoxy Resin Film Reverse Coat1,620 s55 min90%97.4%6376 (1.81 d)43
3. Heated Impregnation Compaction2,083 s60 min84%94.8%5092 (2.19 d)30
4. Chill Drum & PE Backing1,466 s25 min93%98.2%2550 (1.19 d)49
5. Freezer Roll -18°C Release1,080 s10 min97%99.1%1738 (0.90 d)71

Key figures

Takt time
1,929 s
Lead time
9.59 d
Value-added time
7,599 s
Process cycle efficiency (PCE)
0.98%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
42 batches
Line capacity per day
30 batches
Bottleneck
Heated Impregnation Compaction

Reading the bottleneck

The bottleneck is "Heated Impregnation Compaction": it can process 30 batches per day against a demand of 42 batches, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,616 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 397 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.