Needlepunch Recycled PET Automotive Trunk Felt
Product family: Thermoformable Acoustic Mats.
Flow: Recycled Bottle Staple Fiber → Fine Blend & Cross-Lapper Web → High-Density Barb Needlepunch → Latex / PE Powder Spray Back → IR Stenter Bake & Slit Trim → Airflow Acoustic Impedance → Auto Carpet Thermoformers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Fine Blend & Cross-Lapper Web | 756 s | 35 min | 94% | 98.8% | 113 | 120 (1.60 d) | 98 |
| 2. High-Density Barb Needlepunch | 907 s | 55 min | 90% | 97.4% | 113 | 135 (1.80 d) | 76 |
| 3. Latex / PE Powder Spray Back | 1,166 s | 60 min | 84% | 94.8% | 90 | 165 (2.20 d) | 53 |
| 4. IR Stenter Bake & Slit Trim | 821 s | 25 min | 93% | 98.2% | 45 | 90 (1.20 d) | 87 |
| 5. Airflow Acoustic Impedance | 605 s | 10 min | 97% | 99.1% | 30 | 68 (0.91 d) | 126 |
Key figures
- Takt time
- 1,080 s
- Lead time
- 9.56 d
- Value-added time
- 4,255 s
- Process cycle efficiency (PCE)
- 0.55%
- Rolled throughput yield (RTY)
- 88.8%
- Customer demand per day
- 75 batches
- Line capacity per day
- 53 batches
- Bottleneck
- Latex / PE Powder Spray Back
Reading the bottleneck
The bottleneck is "Latex / PE Powder Spray Back": it can process 53 batches per day against a demand of 75 batches, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 1,166 s to 1,464 s, against a takt of 1,080 s. The largest loss at this step is equipment downtime (uptime 84%), about 222 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Spinning, Weaving, Dyeing & Tech Textiles: Spinning, Weaving, Dyeing & Tech Textiles
- 100-Ton/Day Combed Ring-Spun Organic Cotton Mill
- Rope-Dyed Indigo & Air-Jet Shuttleless Denim Mill
- Pad-Steam Continuous Reactive Cotton Dye Range
- Meta-Aramid Firefighter Turnout Outer Shell Roll
- Triple-Beam SMS Non-Woven Hygiene Fabric Roll
- Unidirectional Wind-Spar Carbon Tow Prepreg Line
- Split-Bicomponent Warp-Knit Microfiber Roll