Modular Cabinetry & Millwork Line
Product family: Kitchen & Office Modular Cabinets.
Flow: FSC Timber & Hinge Hardware → CNC Panel Nesting Cut → Edge Banding & Glue → Lacquer Booth & UV Cure → Dowel Boring & Fittings → Flat-Pack & Corner Guard → Showrooms & B2B Contractors
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. CNC Panel Nesting Cut | 61.0 s | 18 min | 95% | 98.8% | 300 | 480 (1.60 d) | 399 |
| 2. Edge Banding & Glue | 70.0 s | 22 min | 93% | 98.0% | 180 | 420 (1.40 d) | 323 |
| 3. Lacquer Booth & UV Cure | 96.0 s | 35 min | 85% | 94.0% | 300 | 600 (2.00 d) | 207 |
| 4. Dowel Boring & Fittings | 67.0 s | 15 min | 93% | 97.6% | 120 | 300 (1.00 d) | 335 |
| 5. Flat-Pack & Corner Guard | 50.0 s | 8 min | 97% | 99.3% | 90 | 240 (0.80 d) | 489 |
Key figures
- Takt time
- 90.0 s
- Lead time
- 8.21 d
- Value-added time
- 344 s
- Process cycle efficiency (PCE)
- 0.16%
- Rolled throughput yield (RTY)
- 88.2%
- Customer demand per day
- 300 units
- Line capacity per day
- 207 units
- Bottleneck
- Lacquer Booth & UV Cure
Reading the bottleneck
The bottleneck is "Lacquer Booth & UV Cure": it can process 207 units per day against a demand of 300 units, so it falls short of demand by 30.9%. Once downtime and scrap are counted, its cycle time grows from 96.0 s to 120 s, against a takt of 90.0 s. The largest loss at this step is equipment downtime (uptime 85%), about 16.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Furniture, Millwork & Joinery: Furniture, Millwork & Joinery
- Modular Beech-Frame Upholstered Sectional Sofa
- Solid French Oak Butterfly-Extension Dining Table
- BIFMA Certified Mesh Ergonomic Task Chair
- Wood-Veneer Slatted Recycled PET Acoustic Wall
- 3-Layer Engineered Oak Click-Lock Parquet Line
- EI-30 Fire-Rated Acoustic Flush Interior Door
- Hospitality Turnkey Guestroom Casegoods Fit-Out
- Modular Flagship Cosmetics Store Gondola Display
- FSC Teak & All-Weather Rope Patio Lounger
- Tip-Up Fire-Retardant Auditorium Cinema Seat
- Water-Based Non-Toxic EN-71 Wooden Toy Kitchen