Hospitality Turnkey Guestroom Casegoods Fit-Out

Product family: 4-Star Headboard & Vanity Kit.

Flow: HPL, Walnut Veneer & Brass → BIM Room Cut-List Optimization → CNC Machining & PUR Edging → Brush Brass & LED Channel Fit → Dry-Fit Room Mockup Check → Room-Numbered Blanket Wrap → Hotel Renovation Contractors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hospitality Turnkey Guestroom Casegoods Fit-OutSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. HPL, Walnut Veneer & Brass → BIM Room Cut-List Optimization (334 s) → CNC Machining & PUR Edging (383 s) → Brush Brass & LED Channel Fit (525 s) → Dry-Fit Room Mockup Check (363 s) → Room-Numbered Blanket Wrap (275 s) → Hotel Renovation Contractors.SUPPLIERHPL, WalnutVeneer & BrassI1.60 d1BIM Room Cut-ListOptimizationC/T 334 sI1.40 d2CNC Machining &PUR EdgingC/T 383 sI2.00 d3Brush Brass & LEDChannel FitC/T 525 sI1.00 d4Dry-Fit RoomMockup CheckC/T 363 sI0.80 d5Room-NumberedBlanket WrapC/T 275 sI1.40 dCUSTOMERHotelRenovation…110 / rooms

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. BIM Room Cut-List Optimization334 s18 min95%98.8%110176 (1.60 d)149
2. CNC Machining & PUR Edging383 s22 min93%98.0%66154 (1.40 d)123
3. Brush Brass & LED Channel Fit525 s35 min85%94.0%110220 (2.00 d)79
4. Dry-Fit Room Mockup Check363 s15 min93%97.6%44110 (1.00 d)129
5. Room-Numbered Blanket Wrap275 s8 min97%99.3%3388 (0.80 d)184

Key figures

Takt time
491 s
Lead time
8.23 d
Value-added time
1,880 s
Process cycle efficiency (PCE)
0.42%
Rolled throughput yield (RTY)
88.2%
Customer demand per day
110 rooms
Line capacity per day
79 rooms
Bottleneck
Brush Brass & LED Channel Fit

Reading the bottleneck

The bottleneck is "Brush Brass & LED Channel Fit": it can process 79 rooms per day against a demand of 110 rooms, so it falls short of demand by 28.2%. Once downtime and scrap are counted, its cycle time grows from 525 s to 657 s, against a takt of 491 s. The largest loss at this step is equipment downtime (uptime 85%), about 92.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.