EI-30 Fire-Rated Acoustic Flush Interior Door

Product family: Pre-Hung Architectural Doors.

Flow: HPL Skins & Flaxboard Core → Intumescent Rail Core Frame → HPL Skin Hot Press Cure → 5-Axis Hinge & Lock Mortise → CPL Wrap & Pre-Hang Frame → Foam Guard Wrap & Stillage → Commercial Towers & Hotels

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: EI-30 Fire-Rated Acoustic Flush Interior DoorSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. HPL Skins & Flaxboard Core → Intumescent Rail Core Frame (108 s) → HPL Skin Hot Press Cure (124 s) → 5-Axis Hinge & Lock Mortise (170 s) → CPL Wrap & Pre-Hang Frame (118 s) → Foam Guard Wrap & Stillage (89.0 s) → Commercial Towers & Hotels.SUPPLIERHPL Skins &Flaxboard CoreI1.60 d1Intumescent RailCore FrameC/T 108 sI1.40 d2HPL Skin HotPress CureC/T 124 sI2.00 d35-Axis Hinge &Lock MortiseC/T 170 sI1.00 d4CPL Wrap &Pre-Hang FrameC/T 118 sI0.80 d5Foam Guard Wrap &StillageC/T 89.0 sI1.40 dCUSTOMERCommercialTowers & Hotels340 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Intumescent Rail Core Frame108 s18 min95%98.8%340544 (1.60 d)460
2. HPL Skin Hot Press Cure124 s22 min93%98.0%204476 (1.40 d)381
3. 5-Axis Hinge & Lock Mortise170 s35 min85%94.0%340680 (2.00 d)244
4. CPL Wrap & Pre-Hang Frame118 s15 min93%97.6%136340 (1.00 d)398
5. Foam Guard Wrap & Stillage89.0 s8 min97%99.3%102272 (0.80 d)567

Key figures

Takt time
159 s
Lead time
8.21 d
Value-added time
609 s
Process cycle efficiency (PCE)
0.14%
Rolled throughput yield (RTY)
88.2%
Customer demand per day
340 units
Line capacity per day
244 units
Bottleneck
5-Axis Hinge & Lock Mortise

Reading the bottleneck

The bottleneck is "5-Axis Hinge & Lock Mortise": it can process 244 units per day against a demand of 340 units, so it falls short of demand by 28.3%. Once downtime and scrap are counted, its cycle time grows from 170 s to 213 s, against a takt of 159 s. The largest loss at this step is equipment downtime (uptime 85%), about 30.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.