Modular Beech-Frame Upholstered Sectional Sofa

Product family: Made-to-Order Living Sofas.

Flow: Beech Kiln Timber & Bouclé → CNC Frame Cut & Staple Jig → No-Sag Sinuous Spring Mount → Water-Based Spray & HR Foam → CAD Fabric Cut & Sew Fit → Pull-Trim Dust Cover & Bag → Furniture Retail Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Modular Beech-Frame Upholstered Sectional SofaSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Beech Kiln Timber & Bouclé → CNC Frame Cut & Staple Jig (216 s) → No-Sag Sinuous Spring Mount (248 s) → Water-Based Spray & HR Foam (340 s) → CAD Fabric Cut & Sew Fit (235 s) → Pull-Trim Dust Cover & Bag (178 s) → Furniture Retail Chains.SUPPLIERBeech KilnTimber & BoucléI1.60 d1CNC Frame Cut &Staple JigC/T 216 sI1.40 d2No-Sag SinuousSpring MountC/T 248 sI2.00 d3Water-Based Spray& HR FoamC/T 340 sI1.00 d4CAD Fabric Cut &Sew FitC/T 235 sI0.80 d5Pull-Trim DustCover & BagC/T 178 sI1.40 dCUSTOMERFurnitureRetail Chains85 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. CNC Frame Cut & Staple Jig216 s18 min95%98.8%85136 (1.60 d)113
2. No-Sag Sinuous Spring Mount248 s22 min93%98.0%51119 (1.40 d)91
3. Water-Based Spray & HR Foam340 s35 min85%94.0%85170 (2.00 d)59
4. CAD Fabric Cut & Sew Fit235 s15 min93%97.6%3485 (1.00 d)96
5. Pull-Trim Dust Cover & Bag178 s8 min97%99.3%2668 (0.80 d)138

Key figures

Takt time
318 s
Lead time
8.25 d
Value-added time
1,217 s
Process cycle efficiency (PCE)
0.55%
Rolled throughput yield (RTY)
88.2%
Customer demand per day
85 units
Line capacity per day
59 units
Bottleneck
Water-Based Spray & HR Foam

Reading the bottleneck

The bottleneck is "Water-Based Spray & HR Foam": it can process 59 units per day against a demand of 85 units, so it falls short of demand by 31.2%. Once downtime and scrap are counted, its cycle time grows from 340 s to 426 s, against a takt of 318 s. The largest loss at this step is equipment downtime (uptime 85%), about 60.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.