Tip-Up Fire-Retardant Auditorium Cinema Seat

Product family: Acoustic Perforated Theatre.

Flow: Die-Cast Stanchions & FR Foam → Steam-Bent Beech Seat Shell → Acoustic Bottom Laser Micro-Perf → FR Molded Foam & FR Fabric Trim → Gravity Counterweight Hinge Fit → 20,000-Tip Life Cycle Sample → Theaters & Universities

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Tip-Up Fire-Retardant Auditorium Cinema SeatSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Die-Cast Stanchions & FR Foam → Steam-Bent Beech Seat Shell (230 s) → Acoustic Bottom Laser Micro-Perf (263 s) → FR Molded Foam & FR Fabric Trim (361 s) → Gravity Counterweight Hinge Fit (250 s) → 20,000-Tip Life Cycle Sample (189 s) → Theaters & Universities.SUPPLIERDie-CastStanchions & FRFoamI1.60 d1Steam-Bent BeechSeat ShellC/T 230 sI1.40 d2Acoustic BottomLaser Micro-PerfC/T 263 sI2.00 d3FR Molded Foam &FR Fabric TrimC/T 361 sI1.00 d4GravityCounterweight…C/T 250 sI0.80 d520,000-Tip LifeCycle SampleC/T 189 sI1.40 dCUSTOMERTheaters &Universities160 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Steam-Bent Beech Seat Shell230 s18 min95%98.8%160256 (1.60 d)216
2. Acoustic Bottom Laser Micro-Perf263 s22 min93%98.0%96224 (1.40 d)180
3. FR Molded Foam & FR Fabric Trim361 s35 min85%94.0%160320 (2.00 d)115
4. Gravity Counterweight Hinge Fit250 s15 min93%97.6%64160 (1.00 d)188
5. 20,000-Tip Life Cycle Sample189 s8 min97%99.3%48128 (0.80 d)267

Key figures

Takt time
338 s
Lead time
8.22 d
Value-added time
1,293 s
Process cycle efficiency (PCE)
0.29%
Rolled throughput yield (RTY)
88.2%
Customer demand per day
160 units
Line capacity per day
115 units
Bottleneck
FR Molded Foam & FR Fabric Trim

Reading the bottleneck

The bottleneck is "FR Molded Foam & FR Fabric Trim": it can process 115 units per day against a demand of 160 units, so it falls short of demand by 28.2%. Once downtime and scrap are counted, its cycle time grows from 361 s to 452 s, against a takt of 338 s. The largest loss at this step is equipment downtime (uptime 85%), about 63.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.