Water-Based Non-Toxic EN-71 Wooden Toy Kitchen

Product family: CNC Birch Ply Playsets.

Flow: Baltic Birch FSC Plywood → High-Speed Nesting Router → Tumble Chamfer & Splinter Free → EN-71 Water-Based Drum Paint → Silkscreen Dial & Magnet Door → Drop-Test Corrugated Gift Box → Toy Retailers & E-Commerce

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Water-Based Non-Toxic EN-71 Wooden Toy KitchenSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Baltic Birch FSC Plywood → High-Speed Nesting Router (87.0 s) → Tumble Chamfer & Splinter Free (100 s) → EN-71 Water-Based Drum Paint (138 s) → Silkscreen Dial & Magnet Door (95.0 s) → Drop-Test Corrugated Gift Box (72.0 s) → Toy Retailers & E-Commerce.SUPPLIERBaltic BirchFSC PlywoodI1.60 d1High-SpeedNesting RouterC/T 87.0 sI1.40 d2Tumble Chamfer &Splinter FreeC/T 100 sI2.00 d3EN-71 Water-BasedDrum PaintC/T 138 sI1.00 d4Silkscreen Dial &Magnet DoorC/T 95.0 sI0.80 d5Drop-TestCorrugated Gift…C/T 72.0 sI1.40 dCUSTOMERToy Retailers &E-Commerce420 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. High-Speed Nesting Router87.0 s18 min95%98.8%420672 (1.60 d)571
2. Tumble Chamfer & Splinter Free100 s22 min93%98.0%252588 (1.40 d)472
3. EN-71 Water-Based Drum Paint138 s35 min85%94.0%420840 (2.00 d)300
4. Silkscreen Dial & Magnet Door95.0 s15 min93%97.6%168420 (1.00 d)494
5. Drop-Test Corrugated Gift Box72.0 s8 min97%99.3%126336 (0.80 d)701

Key figures

Takt time
129 s
Lead time
8.21 d
Value-added time
492 s
Process cycle efficiency (PCE)
0.11%
Rolled throughput yield (RTY)
88.2%
Customer demand per day
420 units
Line capacity per day
300 units
Bottleneck
EN-71 Water-Based Drum Paint

Reading the bottleneck

The bottleneck is "EN-71 Water-Based Drum Paint": it can process 300 units per day against a demand of 420 units, so it falls short of demand by 28.5%. Once downtime and scrap are counted, its cycle time grows from 138 s to 173 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 85%), about 24.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Furniture, Millwork & Joinery: Furniture, Millwork & Joinery