Wood-Veneer Slatted Recycled PET Acoustic Wall

Product family: 2400x600mm Sound Slat Panels.

Flow: Black Recycled PET Felt → MDF Acoustic Veneer Press → Multi-Blade Rip Slats & Sand → Automatic Felt-to-Slat Glue → Nail-Free Stapling & Trim → Shrink Twin-Pack & Edge Guard → Architect & Commercial Interiors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Wood-Veneer Slatted Recycled PET Acoustic WallSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Black Recycled PET Felt → MDF Acoustic Veneer Press (56.0 s) → Multi-Blade Rip Slats & Sand (65.0 s) → Automatic Felt-to-Slat Glue (89.0 s) → Nail-Free Stapling & Trim (61.0 s) → Shrink Twin-Pack & Edge Guard (47.0 s) → Architect & Commercial Interiors.SUPPLIERBlack RecycledPET FeltI1.60 d1MDF AcousticVeneer PressC/T 56.0 sI1.40 d2Multi-Blade RipSlats & SandC/T 65.0 sI2.00 d3AutomaticFelt-to-Slat GlueC/T 89.0 sI1.00 d4Nail-FreeStapling & TrimC/T 61.0 sI0.80 d5Shrink Twin-Pack& Edge GuardC/T 47.0 sI1.40 dCUSTOMERArchitect &Commercial…650 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. MDF Acoustic Veneer Press56.0 s18 min95%98.8%6501,040 (1.60 d)887
2. Multi-Blade Rip Slats & Sand65.0 s22 min93%98.0%390910 (1.40 d)726
3. Automatic Felt-to-Slat Glue89.0 s35 min85%94.0%6501,300 (2.00 d)466
4. Nail-Free Stapling & Trim61.0 s15 min93%97.6%260650 (1.00 d)770
5. Shrink Twin-Pack & Edge Guard47.0 s8 min97%99.3%195520 (0.80 d)1,074

Key figures

Takt time
83.1 s
Lead time
8.21 d
Value-added time
318 s
Process cycle efficiency (PCE)
0.072%
Rolled throughput yield (RTY)
88.2%
Customer demand per day
650 parts
Line capacity per day
466 parts
Bottleneck
Automatic Felt-to-Slat Glue

Reading the bottleneck

The bottleneck is "Automatic Felt-to-Slat Glue": it can process 466 parts per day against a demand of 650 parts, so it falls short of demand by 28.3%. Once downtime and scrap are counted, its cycle time grows from 89.0 s to 111 s, against a takt of 83.1 s. The largest loss at this step is equipment downtime (uptime 85%), about 15.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.