BIFMA Certified Mesh Ergonomic Task Chair

Product family: Synchro-Tilt Office Seating.

Flow: Recycled Aluminum & Pellicle → Breathable Mesh Frame Tension → Synchronized Tilt Mech Bolt → 4D Armrest & Class-4 Piston → Clean Bench Lumbar Tension → Automated Carton & Knock-Down → Corporate Workplace Dealers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: BIFMA Certified Mesh Ergonomic Task ChairSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Recycled Aluminum & Pellicle → Breathable Mesh Frame Tension (77.0 s) → Synchronized Tilt Mech Bolt (88.0 s) → 4D Armrest & Class-4 Piston (120 s) → Clean Bench Lumbar Tension (83.0 s) → Automated Carton & Knock-Down (63.0 s) → Corporate Workplace Dealers.SUPPLIERRecycledAluminum &PellicleI1.60 d1Breathable MeshFrame TensionC/T 77.0 sI1.40 d2Synchronized TiltMech BoltC/T 88.0 sI2.00 d34D Armrest &Class-4 PistonC/T 120 sI1.00 d4Clean BenchLumbar TensionC/T 83.0 sI0.80 d5Automated Carton& Knock-DownC/T 63.0 sI1.40 dCUSTOMERCorporateWorkplace…480 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Breathable Mesh Frame Tension77.0 s18 min95%98.8%480768 (1.60 d)645
2. Synchronized Tilt Mech Bolt88.0 s22 min93%98.0%288672 (1.40 d)536
3. 4D Armrest & Class-4 Piston120 s35 min85%94.0%480960 (2.00 d)346
4. Clean Bench Lumbar Tension83.0 s15 min93%97.6%192480 (1.00 d)566
5. Automated Carton & Knock-Down63.0 s8 min97%99.3%144384 (0.80 d)801

Key figures

Takt time
113 s
Lead time
8.21 d
Value-added time
431 s
Process cycle efficiency (PCE)
0.097%
Rolled throughput yield (RTY)
88.2%
Customer demand per day
480 units
Line capacity per day
346 units
Bottleneck
4D Armrest & Class-4 Piston

Reading the bottleneck

The bottleneck is "4D Armrest & Class-4 Piston": it can process 346 units per day against a demand of 480 units, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 120 s to 150 s, against a takt of 113 s. The largest loss at this step is equipment downtime (uptime 85%), about 21.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.