FSC Teak & All-Weather Rope Patio Lounger

Product family: Marine-Grade Outdoor Teak.

Flow: Grade-A Plantation Teak → 5-Axis Mortise & Tenon Cut → Multi-Grit Fine Finish Sanding → Olefin Weatherproof Rope Weave → 316 Stainless Hardware Join → Natural Teak Sealer & Carton → Resorts & Garden Retailers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: FSC Teak & All-Weather Rope Patio LoungerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Grade-A Plantation Teak → 5-Axis Mortise & Tenon Cut (193 s) → Multi-Grit Fine Finish Sanding (222 s) → Olefin Weatherproof Rope Weave (304 s) → 316 Stainless Hardware Join (210 s) → Natural Teak Sealer & Carton (159 s) → Resorts & Garden Retailers.SUPPLIERGrade-APlantation TeakI1.60 d15-Axis Mortise &Tenon CutC/T 193 sI1.40 d2Multi-Grit FineFinish SandingC/T 222 sI2.00 d3OlefinWeatherproof Rop…C/T 304 sI1.00 d4316 StainlessHardware JoinC/T 210 sI0.80 d5Natural TeakSealer & CartonC/T 159 sI1.40 dCUSTOMERResorts &Garden…95 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 5-Axis Mortise & Tenon Cut193 s18 min95%98.8%95152 (1.60 d)126
2. Multi-Grit Fine Finish Sanding222 s22 min93%98.0%57133 (1.40 d)102
3. Olefin Weatherproof Rope Weave304 s35 min85%94.0%95190 (2.00 d)65
4. 316 Stainless Hardware Join210 s15 min93%97.6%3895 (1.00 d)107
5. Natural Teak Sealer & Carton159 s8 min97%99.3%2976 (0.80 d)154

Key figures

Takt time
284 s
Lead time
8.24 d
Value-added time
1,088 s
Process cycle efficiency (PCE)
0.49%
Rolled throughput yield (RTY)
88.2%
Customer demand per day
95 units
Line capacity per day
65 units
Bottleneck
Olefin Weatherproof Rope Weave

Reading the bottleneck

The bottleneck is "Olefin Weatherproof Rope Weave": it can process 65 units per day against a demand of 95 units, so it falls short of demand by 31.1%. Once downtime and scrap are counted, its cycle time grows from 304 s to 380 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 85%), about 53.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.