Aerospace, Defense & CNC VSM Templates
Aerospace, Defense & CNC covers 6 flow families and 72 editable value stream maps. Each family shares one five-step flow; choose the family closest to your process, then compare its scenarios.
Flow families
- 5-Axis Aerospace Machining & NDT12 scenarios
- Carbon Composites & Autoclave12 scenarios
- Avionics, Space & Flight Electronics12 scenarios
- Jet Engines & Propulsion Systems12 scenarios
- Aircraft MRO & Heavy Overhaul12 scenarios
- Defense, Naval & Optronics Systems12 scenarios
Worked maps
These maps are the reference scenario of each family. The other scenarios of a family are listed on its page.
- Aerospace 5-Axis CNC & NDT Inspection · 5-Axis Aerospace Machining & NDT
- One-Piece CFRP Aircraft Fuselage Section · Carbon Composites & Autoclave
- Triple-Redundant Flight Control Computer · Avionics, Space & Flight Electronics
- Single-Crystal Nickel-Superalloy Turbine Blade Cast · Jet Engines & Propulsion Systems
- Narrowbody A320/737 Heavy C-Check Hangar · Aircraft MRO & Heavy Overhaul
- Submarine Acoustic Composite Bow Sonar Dome · Defense, Naval & Optronics Systems