5-Axis Aerospace Machining & NDT VSM Scenarios
12 scenarios of 5-Axis Aerospace Machining & NDT, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Alloy Billet Sawing → Rough Mill & Stress Relief → 5-Axis CNC Finish Milling → Thermal & Shot Peening → FPI Penetrant NDT & CMM. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Aerospace 5-Axis CNC & NDT Inspection | 40 brackets per day | 2 | 1,350 s | 12.7 d | 0.78% | 5-Axis CNC Milling |
| Titanium Compressor Blisk 5-Axis Flank Mill | 12 parts per day | 3 | 6,750 s | 12.9 d | 2.6% | 5-Axis Flank Airfoil Finish |
| Ultra-High-Strength 300M Landing Gear Piston | 14 parts per day | 2 | 3,857 s | 12.9 d | 2.2% | Vacuum Carburize & Quench |
| 7075-T6 Aluminum Monolithic Wing Rib Line | 65 parts per day | 2 | 831 s | 12.7 d | 0.48% | Flip-Side Web Thin Wall |
| 30-Meter Long-Bed Wing Spar Milling | 8 parts per day | 3 | 10,125 s | 13.1 d | 3.8% | Stress-Relief Cryo Stabilize |
| Accessory Drive Gearbox Magnesium Casting | 18 parts per day | 2 | 3,000 s | 12.8 d | 1.7% | 5-Axis Oil Gallery Drill |
| Fly-by-Wire Titanium Hydraulic Manifold | 45 parts per day | 2 | 1,200 s | 12.7 d | 0.70% | Thermal Deburr & Micro-Hone |
| 15-5PH Stainless Flap Track Carriage | 36 parts per day | 2 | 1,500 s | 12.7 d | 0.87% | H1025 Precipitation Harden |
| Main Rotor Helicopter Swashplate Assembly | 10 assemblies per day | 2 | 5,400 s | 13.0 d | 3.1% | Fretting Tungsten Coat |
| Nickel-Alloy 718 Satellite Thruster Chamber | 24 parts per day | 1 | 1,125 s | 12.8 d | 1.3% | Vacuum Anneal & Mill |
| Ti-5553 Engine Mount Pylon Drag Fitting | 22 parts per day | 2 | 2,455 s | 12.8 d | 1.4% | Finish Spherical Bore Grind |
| 7150 Aluminum Extruded Cabin Seat Track | 160 parts per day | 2 | 338 s | 12.6 d | 0.20% | 5-Axis Lug & Weight Pocket |