Jet Engines & Propulsion Systems VSM Scenarios

12 scenarios of Jet Engines & Propulsion Systems, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Superalloy Wax Invest Cast → Creep-Feed Profile Grind → TBC Plasma Coat & EDM Drill → High-Speed Rotor Dynamic Bal → Cell Full-Thrust Sea-Level Test. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
Single-Crystal Nickel-Superalloy Turbine Blade Cast180 parts per day3450 s11.3 d0.20%Bridgman Single-Crystal Cast
Powder-Metallurgy Nickel HPC Rotor Disk16 parts per day23,375 s11.6 d2.2%Broach 64 Fir-Tree Dovetails
Laser-Drilled Effusion Cooling Combustor14 units per day23,857 s11.6 d2.5%Electron-Beam Flange Weld
Cooled Nozzle Guide Vane Stator Sector52 parts per day21,038 s11.4 d0.69%Water-Flow Cooling Verify
Composite Fan Cowl & Exhaust Nacelle Build14 units per day23,857 s11.6 d2.5%Anti-Ice Duct Pipe Routing
150kW Aircraft Auxiliary Power Unit Assembly20 units per day22,700 s11.5 d1.8%Fuel Control Hydromech Fit
High-Bypass Geared Turbofan Final Line6 units per day29,000 s12.0 d5.6%External Harness & Tube Dress
Liquid Hydrogen Cryogenic Rocket Valve16 units per day11,688 s11.6 d2.2%Cleanroom Oxygen Cleaning
LOX / Methane Rocket Engine Turbopump6 units per day14,500 s12.0 d5.6%Silicon Nitride Bearing Fit
Ceramic Silicon-Nitride Mainshaft Engine Bearing120 units per day2450 s11.3 d0.30%Silver-Plated Cage Broach
Additive-Printed Titanium Engine Fuel Nozzle140 parts per day2386 s11.3 d0.26%Abrasive Flow Channel Polish
Lobed Chevron Acoustic Jet Exhaust Mixer14 units per day23,857 s11.6 d2.5%Vacuum Chamber TIG Weld