Triple-Redundant Flight Control Computer
Product family: DO-254 Primary FCC Box.
Flow: Rad-hard semiconductor supplier → Class-3 Fine-Pitch SMT → Automated Optical & X-Ray → Parylene Conformal Vapor Coat → Chassis Card-Edge Backplane → Hardware-in-Loop Flight Sim → OEM Cockpit Avionics Bay
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Class-3 Fine-Pitch SMT | 810 s | 35 min | 94% | 98.2% | 19 | 36 (1.50 d) | 28 |
| 2. Automated Optical & X-Ray | 923 s | 15 min | 92% | 96.8% | 12 | 38 (1.58 d) | 24 |
| 3. Parylene Conformal Vapor Coat | 1,215 s | 45 min | 85% | 93.8% | 24 | 58 (2.42 d) | 16 |
| 4. Chassis Card-Edge Backplane | 788 s | 20 min | 95% | 98.5% | 10 | 26 (1.08 d) | 29 |
| 5. Hardware-in-Loop Flight Sim | 720 s | 12 min | 96% | 99.1% | 6 | 22 (0.92 d) | 32 |
Key figures
- Takt time
- 1,125 s
- Lead time
- 9.17 d
- Value-added time
- 4,456 s
- Process cycle efficiency (PCE)
- 1.8%
- Rolled throughput yield (RTY)
- 87.0%
- Customer demand per day
- 24 units
- Line capacity per day
- 16 units
- Bottleneck
- Parylene Conformal Vapor Coat
Reading the bottleneck
The bottleneck is "Parylene Conformal Vapor Coat": it can process 16 units per day against a demand of 24 units, so it falls short of demand by 33.6%. Once downtime and scrap are counted, its cycle time grows from 1,215 s to 1,524 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 85%), about 214 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Avionics, Space & Flight Electronics: Avionics, Space & Flight Electronics
- Ring-Laser Gyroscope Inertial Reference IRU
- AESA Airborne Phased-Array Radar Antenna
- 15-Inch Synthetic Vision Cockpit LCD/OLED
- Dual-Channel FADEC Engine Control ECU
- Full-Fuselage PTFE Aerospace Cable Harness
- Ka-Band LEO Satellite Payload Transponder
- Crash-Survivable Flight Data & CVR Recorder
- Smart Heated Pitot-Static Air Data Probe
- Bipolar Full-Spectrum Mood Cabin Lighting
- 5G-Immune Radar Altimeter LRUs
- Encrypted Beyond-Line-of-Sight UAV Modem