Defense, Naval & Optronics Systems VSM Scenarios
12 scenarios of Defense, Naval & Optronics Systems, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Armor Plate & Housing Prep → Clean-Bench Optical Align → Gyrostabilized Gimbal Integ → MIL-STD Shock & Salt Fog → Customer SAT Acceptance. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Submarine Acoustic Composite Bow Sonar Dome | 3 units per day | 1 | 9,000 s | 11.3 d | 11.6% | Ti Flange Bond & Drill |
| Unmanned 30mm Armored Vehicle Gun Turret | 6 units per day | 2 | 9,000 s | 10.7 d | 6.2% | Cannon Cradle & Loader Fit |
| VPX Conduction-Cooled Tactical Edge Server | 35 units per day | 1 | 771 s | 10.1 d | 1.1% | Thermal Pad & Conduction Seal |
| Airborne Multi-Spectral EOTS Targeting Pod | 12 units per day | 1 | 2,250 s | 10.4 d | 3.2% | Laser Rangefinder Bore-Sight |
| Gen-3 Quad-Tube Night Vision Goggle Binocular | 65 units per day | 1 | 415 s | 10.1 d | 0.60% | IIT Cleanroom Drop-In |
| Level-IV Silicon Carbide Ballistic Armor Plate | 450 parts per day | 2 | 120 s | 10.0 d | 0.088% | UHMWPE Autoclave Laminate |
| 42-Meter Hollow Marine Propulsion Shaft Line | 4 parts per day | 2 | 13,500 s | 11.0 d | 9.0% | GRP Composite Protective Wrap |
| Sub-Safe Nickel-Aluminum-Bronze Hull Valve | 24 units per day | 1 | 1,125 s | 10.2 d | 1.6% | Cobalt-Alloy Seat Lap & Stem Fit |
| Tactical Interceptor Electromechanical Fin Kit | 80 assemblies per day | 2 | 675 s | 10.0 d | 0.49% | Thermal Battery Housing Mate |
| S-Band Naval Solid-State Phased Radar Mast | 4 units per day | 1 | 6,750 s | 11.0 d | 9.0% | Dielectric Coolant Flush |
| Autonomous Unmanned Surface Patrol Craft | 5 units per day | 1 | 5,400 s | 11.0 d | 7.2% | Twin Jet Drive & Genset Fit |
| MIL-STD Software-Defined Tactical Manpack | 95 units per day | 2 | 568 s | 10.1 d | 0.41% | NSA Type-1 Crypto Fill |