Avionics, Space & Flight Electronics VSM Scenarios

12 scenarios of Avionics, Space & Flight Electronics, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: IPC Class-3 SMT Placement → Hand Soldering & Coat → Thermal Vacuum & ESS Vib → Chassis Hermetic Laser Seal → DO-178 ATE Flight Cert. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
Triple-Redundant Flight Control Computer24 units per day11,125 s9.17 d1.8%Parylene Conformal Vapor Coat
Ring-Laser Gyroscope Inertial Reference IRU30 units per day1900 s9.13 d1.4%PZT Dither & Cathode Seal
AESA Airborne Phased-Array Radar Antenna10 units per day12,700 s9.40 d4.2%Liquid Cold-Plate Integration
15-Inch Synthetic Vision Cockpit LCD/OLED55 units per day1491 s9.11 d0.79%Dual Backlight Driver Mate
Dual-Channel FADEC Engine Control ECU42 units per day21,286 s9.09 d1.0%Elastomeric Shock Isolator
Full-Fuselage PTFE Aerospace Cable Harness28 assemblies per day21,929 s9.14 d1.5%Mil-38999 Crimp & Back-Shell
Ka-Band LEO Satellite Payload Transponder16 units per day11,688 s9.25 d2.7%Laser Hermetic Lid Seal
Crash-Survivable Flight Data & CVR Recorder65 units per day2831 s9.09 d0.67%Titanium Armor Shell Weld
Smart Heated Pitot-Static Air Data Probe110 units per day2491 s9.04 d0.40%Air-Data Pressure Transducer
Bipolar Full-Spectrum Mood Cabin Lighting420 units per day2129 s9.01 d0.10%DALI / ARINC Address Flash
5G-Immune Radar Altimeter LRUs48 units per day1563 s9.08 d0.91%Gasketed EMI Lid Screw
Encrypted Beyond-Line-of-Sight UAV Modem60 units per day1450 s9.07 d0.73%AES Crypto Key Provision