Carbon Composites & Autoclave VSM Scenarios

12 scenarios of Carbon Composites & Autoclave, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Prepreg Ply Ultrasonic Cut → AFP Fiber Tape Layup → Autoclave Cure & Bagging → Waterjet Trim & Honeycomb Mill → Phased-Array Ultrasonic C-Scan. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
One-Piece CFRP Aircraft Fuselage Section4 units per day320,250 s10.7 d9.3%Mega-Autoclave Cure Cycle
Composite Upper/Lower Wing Skin Panel8 parts per day310,125 s10.6 d4.7%Double Vacuum Debulk Bag
3D Woven Carbon Jet Engine Fan Case16 units per day23,375 s10.4 d2.4%Oven Post-Cure Release
Quartz-Honeycomb Nose Weather Radome20 units per day11,350 s10.3 d1.9%Autoclave Co-Cure Bond
Acoustic Carbon Cascade Thrust Reverser22 units per day22,455 s10.3 d1.8%Titan Actuator Frame Mate
Composite Glass/Carbon Helicopter Rotor Blade18 parts per day23,000 s10.3 d2.1%Matched Clamshell Heated Press
Blended Aerodynamic Split-Scimitar Winglet30 parts per day21,800 s10.2 d1.3%Edge Trim & Lightning Mesh
CFRP Aluminum-Honeycomb Satellite Solar Bus10 parts per day12,700 s10.5 d3.8%Autoclave Structural Bond
Carbon Monocoque MALE UAV Airframe14 units per day11,929 s10.3 d2.8%Structural Adhesive Join
Fire-Retardant Phenolic Overhead Stowage Bin85 units per day2635 s10.2 d0.46%Edge Seal & Latch Insert
SiC-SiC Ceramic Matrix Exhaust Mixer25 parts per day11,080 s10.3 d1.5%1600°C Inert Furnace Cure
Lightweight Aerospace ULD Composite Container70 units per day2771 s10.2 d0.56%Aramid Curtain & Zipper Sew