Narrowbody A320/737 Heavy C-Check Hangar

Product family: Scheduled Airframe C-Checks.

Flow: Airline Operator Fleet → Docking, Open Access & Wash → NDT & Boroscope Structure Audit → Non-Routine Structural Fix → Cabin Reinstall & Gear Swing → Operational Run & CRS Release → Commercial Airline Operators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Narrowbody A320/737 Heavy C-Check HangarSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Airline Operator Fleet → Docking, Open Access & Wash (11,970 s) → NDT & Boroscope Structure Audit (13,338 s) → Non-Routine Structural Fix (18,810 s) → Cabin Reinstall & Gear Swing (13,680 s) → Operational Run & CRS Release (10,260 s) → Commercial Airline Operators.SUPPLIERAirlineOperator FleetI1.50 d1Docking, OpenAccess & WashC/T 11,970 sI1.75 d2NDT & BoroscopeStructure AuditC/T 13,338 sI3.25 d3Non-RoutineStructural FixC/T 18,810 sI1.50 d4Cabin Reinstall &Gear SwingC/T 13,680 sI0.75 d5Operational Run &CRS ReleaseC/T 10,260 sI0.75 dCUSTOMERCommercialAirline…4 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Docking, Open Access & Wash11,970 s20 min95%97.5%26 (1.50 d)5
2. NDT & Boroscope Structure Audit13,338 s25 min92%98.1%37 (1.75 d)4
3. Non-Routine Structural Fix18,810 s40 min82%91.5%413 (3.25 d)3
4. Cabin Reinstall & Gear Swing13,680 s20 min93%97.6%26 (1.50 d)4
5. Operational Run & CRS Release10,260 s10 min97%99.1%13 (0.75 d)6

Key figures

Takt time
17,100 s
Lead time
10.5 d
Value-added time
68,058 s
Process cycle efficiency (PCE)
9.5%
Rolled throughput yield (RTY)
84.6%
Customer demand per day
4 cases
Line capacity per day
3 cases
Bottleneck
Non-Routine Structural Fix

Reading the bottleneck

The bottleneck is "Non-Routine Structural Fix": it can process 3 cases per day against a demand of 4 cases, so it falls short of demand by 34.2%. Once downtime and scrap are counted, its cycle time grows from 18,810 s to 25,070 s, against a takt of 17,100 s. The largest loss at this step is equipment downtime (uptime 82%), about 4,129 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.