Commodities, Coffee, Cocoa & Forestry VSM Scenarios
12 scenarios of Commodities, Coffee, Cocoa & Forestry, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Field Harvest & Weighbridge → Wet Ferment / Pulp Wash → Mechanical Dryer / Sugar Crush → Hulling, Gravity Table & Sort → Jute / Super-Sack & Cert Out. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Washed Arabica Cherry Wet-Mill & Sun-Patio Dry | 28 tonnes per day | 2 | 1,929 s | 8.14 d | 1.7% | Mechanical Dryers + Patio |
| Box-Fermented Traceable Fine-Flavor Cocoa Bean | 34 tonnes per day | 2 | 1,588 s | 8.11 d | 1.4% | Solar Tunnel Dry to 7% Moist |
| 10,000-TPD Sugar Cane Tandem Diffuser & Mill | 420 tonnes per day | 3 | 193 s | 8.01 d | 0.12% | Lime Clarify & 5-Effect Evap |
| High-Grown Leaf Withering, Rolling & Orthodox Tea | 22 tonnes per day | 2 | 2,455 s | 8.18 d | 2.2% | Humid 26°C Copper Ferment |
| High-Capacity Saw Cotton Gin & 227kg Bale Press | 95 tonnes per day | 3 | 853 s | 8.06 d | 0.51% | High-Speed Ribbed Saw Ginning |
| CTL Cut-to-Length Forest Harvester & Forwarder | 260 tonnes per day | 2 | 208 s | 8.01 d | 0.19% | 8WD Forwarder Extraction Haul |
| Optical Berry-Sorted Harvest Crush & Destemming | 65 tonnes per day | 2 | 831 s | 8.09 d | 0.74% | Optical Green-Berry Jet Kick |
| Two-Phase Cold-Press Olive Oil Mill (25°C) | 42 batches per day | 2 | 1,286 s | 8.09 d | 1.1% | 2-Phase Decanter Centrifuge |
| Mobile-Bin Copper Steam Lavender Essential Oil | 14 batches per day | 2 | 3,857 s | 8.28 d | 3.4% | Gooseneck Condense & Florentine |
| Pasteurized Tunnel Substrate & Fresh Button Harvest | 380 crates per day | 2 | 142 s | 8.01 d | 0.13% | 3-Flush Selective Hand Pick |
| Industrial Hemp Bast Fiber & Hurd Decortication | 48 tonnes per day | 2 | 1,125 s | 8.08 d | 1.0% | Air Classifier Bast / Hurd Sep |
| Hevea Natural Rubber RSS3 Smoked Sheet Line | 65 tonnes per day | 2 | 831 s | 8.09 d | 0.74% | 4-Day Biomass Smoke House |