High-Grown Leaf Withering, Rolling & Orthodox Tea

Product family: Export Vacuum-Foil Loose Tea.

Flow: Plucking Estate Baskets → Air Trough 14h Moisture Wither → 30-Min Orthodox Brass Roll → Humid 26°C Copper Ferment → Fluid-Bed Dryer & Fiber Pick → Sieve Grade & Foil-Lined Sack → Global Tea Blenders

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Grown Leaf Withering, Rolling & Orthodox TeaSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Plucking Estate Baskets → Air Trough 14h Moisture Wither (1,669 s) → 30-Min Orthodox Brass Roll (2,062 s) → Humid 26°C Copper Ferment (2,626 s) → Fluid-Bed Dryer & Fiber Pick (1,816 s) → Sieve Grade & Foil-Lined Sack (1,375 s) → Global Tea Blenders.SUPPLIERPlucking EstateBasketsI0.91 d1Air Trough 14hMoisture WitherC/T 1,669 sI1.50 d230-Min OrthodoxBrass RollC/T 2,062 sI2.00 d3Humid 26°C CopperFermentC/T 2,626 sI1.09 d4Fluid-Bed Dryer &Fiber PickC/T 1,816 sI1.00 d5Sieve Grade &Foil-Lined SackC/T 1,375 sI1.50 dCUSTOMERGlobal TeaBlenders22 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Air Trough 14h Moisture Wither1,669 s12 min94%98.2%1120 (0.91 d)29
2. 30-Min Orthodox Brass Roll2,062 s20 min91%97.1%1333 (1.50 d)22
3. Humid 26°C Copper Ferment2,626 s35 min84%95.5%1844 (2.00 d)16
4. Fluid-Bed Dryer & Fiber Pick1,816 s15 min93%98.1%924 (1.09 d)26
5. Sieve Grade & Foil-Lined Sack1,375 s10 min97%99.3%722 (1.00 d)37

Key figures

Takt time
2,455 s
Lead time
8.18 d
Value-added time
9,548 s
Process cycle efficiency (PCE)
2.2%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
22 tonnes
Line capacity per day
16 tonnes
Bottleneck
Humid 26°C Copper Ferment

Reading the bottleneck

The bottleneck is "Humid 26°C Copper Ferment": it can process 16 tonnes per day against a demand of 22 tonnes, so it falls short of demand by 28.6%. Once downtime and scrap are counted, its cycle time grows from 2,626 s to 3,273 s, against a takt of 2,455 s. The largest loss at this step is equipment downtime (uptime 84%), about 500 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.