Hevea Natural Rubber RSS3 Smoked Sheet Line

Product family: Baled Sheet Tire Feedstock.

Flow: Smallholder Latex Field Cups → Sieve Filter & Formic Coagulate → 6-Pair Mangle Squeeze Sheeter → 4-Day Biomass Smoke House → Visual Defect Grade & Clip → 35kg Bale Press & Shrink → Radial Tire Factories

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hevea Natural Rubber RSS3 Smoked Sheet LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Smallholder Latex Field Cups → Sieve Filter & Formic Coagulate (565 s) → 6-Pair Mangle Squeeze Sheeter (698 s) → 4-Day Biomass Smoke House (889 s) → Visual Defect Grade & Clip (615 s) → 35kg Bale Press & Shrink (465 s) → Radial Tire Factories.SUPPLIERSmallholderLatex FieldCupsI0.91 d1Sieve Filter &Formic CoagulateC/T 565 sI1.51 d26-Pair MangleSqueeze SheeterC/T 698 sI2.00 d34-Day BiomassSmoke HouseC/T 889 sI1.11 d4Visual DefectGrade & ClipC/T 615 sI1.00 d535kg Bale Press &ShrinkC/T 465 sI1.51 dCUSTOMERRadial TireFactories65 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Sieve Filter & Formic Coagulate565 s12 min94%98.2%3359 (0.91 d)86
2. 6-Pair Mangle Squeeze Sheeter698 s20 min91%97.1%3998 (1.51 d)66
3. 4-Day Biomass Smoke House889 s35 min84%95.5%52130 (2.00 d)46
4. Visual Defect Grade & Clip615 s15 min93%98.1%2672 (1.11 d)77
5. 35kg Bale Press & Shrink465 s10 min97%99.3%2065 (1.00 d)108

Key figures

Takt time
831 s
Lead time
8.09 d
Value-added time
3,232 s
Process cycle efficiency (PCE)
0.74%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
65 tonnes
Line capacity per day
46 tonnes
Bottleneck
4-Day Biomass Smoke House

Reading the bottleneck

The bottleneck is "4-Day Biomass Smoke House": it can process 46 tonnes per day against a demand of 65 tonnes, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 889 s to 1,108 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 84%), about 169 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Commodities, Coffee, Cocoa & Forestry: Commodities, Coffee, Cocoa & Forestry