Washed Arabica Cherry Wet-Mill & Sun-Patio Dry
Product family: Specialty Grade-1 Green Coffee.
Flow: Smallholder Coffee Pickers → Flotation Sink-Float Ripeness → Eco-Pulper & Enzymatic Wash → Mechanical Dryers + Patio → Huller, Density & UV Sort → Hermetic Jute Bags → Specialty Roasters Worldwide
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Flotation Sink-Float Ripeness | 1,311 s | 12 min | 94% | 98.2% | 14 | 25 (0.89 d) | 37 |
| 2. Eco-Pulper & Enzymatic Wash | 1,620 s | 20 min | 91% | 97.1% | 17 | 42 (1.50 d) | 28 |
| 3. Mechanical Dryers + Patio | 2,064 s | 35 min | 84% | 95.5% | 22 | 56 (2.00 d) | 20 |
| 4. Huller, Density & UV Sort | 1,427 s | 15 min | 93% | 98.1% | 11 | 31 (1.11 d) | 33 |
| 5. Hermetic Jute Bags | 1,080 s | 10 min | 97% | 99.3% | 8 | 28 (1.00 d) | 46 |
Key figures
- Takt time
- 1,929 s
- Lead time
- 8.14 d
- Value-added time
- 7,502 s
- Process cycle efficiency (PCE)
- 1.7%
- Rolled throughput yield (RTY)
- 88.7%
- Customer demand per day
- 28 tonnes
- Line capacity per day
- 20 tonnes
- Bottleneck
- Mechanical Dryers + Patio
Reading the bottleneck
The bottleneck is "Mechanical Dryers + Patio": it can process 20 tonnes per day against a demand of 28 tonnes, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 2,064 s to 2,573 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 393 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commodities, Coffee, Cocoa & Forestry: Commodities, Coffee, Cocoa & Forestry
- Box-Fermented Traceable Fine-Flavor Cocoa Bean
- 10,000-TPD Sugar Cane Tandem Diffuser & Mill
- High-Grown Leaf Withering, Rolling & Orthodox Tea
- High-Capacity Saw Cotton Gin & 227kg Bale Press
- CTL Cut-to-Length Forest Harvester & Forwarder
- Optical Berry-Sorted Harvest Crush & Destemming
- Two-Phase Cold-Press Olive Oil Mill (25°C)
- Mobile-Bin Copper Steam Lavender Essential Oil
- Pasteurized Tunnel Substrate & Fresh Button Harvest
- Industrial Hemp Bast Fiber & Hurd Decortication
- Hevea Natural Rubber RSS3 Smoked Sheet Line