Two-Phase Cold-Press Olive Oil Mill (25°C)

Product family: Polyphenol-Rich Fresh Mill Oil.

Flow: Regional Harvest Crates → De-Leafing Air Blower & Wash → Hammer Crush & 25°C Malaxer → 2-Phase Decanter Centrifuge → Vertical Disc Polish Spin → Nitrogen Blanketed Silo Tank → Olive Bottling & Tanks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Two-Phase Cold-Press Olive Oil Mill (25°C)Supplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Regional Harvest Crates → De-Leafing Air Blower & Wash (874 s) → Hammer Crush & 25°C Malaxer (1,080 s) → 2-Phase Decanter Centrifuge (1,376 s) → Vertical Disc Polish Spin (951 s) → Nitrogen Blanketed Silo Tank (720 s) → Olive Bottling & Tanks.SUPPLIERRegionalHarvest CratesI0.90 d1De-Leafing AirBlower & WashC/T 874 sI1.50 d2Hammer Crush &25°C MalaxerC/T 1,080 sI2.00 d32-Phase DecanterCentrifugeC/T 1,376 sI1.10 d4Vertical DiscPolish SpinC/T 951 sI1.00 d5NitrogenBlanketed Silo…C/T 720 sI1.50 dCUSTOMEROlive Bottling& Tanks42 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. De-Leafing Air Blower & Wash874 s12 min94%98.2%2138 (0.90 d)56
2. Hammer Crush & 25°C Malaxer1,080 s20 min91%97.1%2563 (1.50 d)43
3. 2-Phase Decanter Centrifuge1,376 s35 min84%95.5%3484 (2.00 d)30
4. Vertical Disc Polish Spin951 s15 min93%98.1%1746 (1.10 d)50
5. Nitrogen Blanketed Silo Tank720 s10 min97%99.3%1342 (1.00 d)70

Key figures

Takt time
1,286 s
Lead time
8.09 d
Value-added time
5,001 s
Process cycle efficiency (PCE)
1.1%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
42 batches
Line capacity per day
30 batches
Bottleneck
2-Phase Decanter Centrifuge

Reading the bottleneck

The bottleneck is "2-Phase Decanter Centrifuge": it can process 30 batches per day against a demand of 42 batches, so it falls short of demand by 28.6%. Once downtime and scrap are counted, its cycle time grows from 1,376 s to 1,715 s, against a takt of 1,286 s. The largest loss at this step is equipment downtime (uptime 84%), about 262 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.