Mobile-Bin Copper Steam Lavender Essential Oil

Product family: AOC True Fine Lavender Oil.

Flow: Harvested Field Chopper Bins → Chopper Harvest Into Still Trailer → Sealed Steam-Injection Lid Lock → Gooseneck Condense & Florentine → Dehydrate & GC-MS Linalool QC → Nitrogen Aluminum Drum Seal → Grasse Perfumery Houses

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Mobile-Bin Copper Steam Lavender Essential OilSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Harvested Field Chopper Bins → Chopper Harvest Into Still Trailer (2,623 s) → Sealed Steam-Injection Lid Lock (3,240 s) → Gooseneck Condense & Florentine (4,127 s) → Dehydrate & GC-MS Linalool QC (2,854 s) → Nitrogen Aluminum Drum Seal (2,160 s) → Grasse Perfumery Houses.SUPPLIERHarvested FieldChopper BinsI0.93 d1Chopper HarvestInto Still…C/T 2,623 sI1.50 d2SealedSteam-Injection…C/T 3,240 sI2.00 d3GooseneckCondense &…C/T 4,127 sI1.07 d4Dehydrate & GC-MSLinalool QCC/T 2,854 sI1.00 d5Nitrogen AluminumDrum SealC/T 2,160 sI1.50 dCUSTOMERGrassePerfumery…14 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Chopper Harvest Into Still Trailer2,623 s12 min94%98.2%713 (0.93 d)18
2. Sealed Steam-Injection Lid Lock3,240 s20 min91%97.1%821 (1.50 d)14
3. Gooseneck Condense & Florentine4,127 s35 min84%95.5%1128 (2.00 d)10
4. Dehydrate & GC-MS Linalool QC2,854 s15 min93%98.1%615 (1.07 d)17
5. Nitrogen Aluminum Drum Seal2,160 s10 min97%99.3%414 (1.00 d)23

Key figures

Takt time
3,857 s
Lead time
8.28 d
Value-added time
15,004 s
Process cycle efficiency (PCE)
3.4%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
14 batches
Line capacity per day
10 batches
Bottleneck
Gooseneck Condense & Florentine

Reading the bottleneck

The bottleneck is "Gooseneck Condense & Florentine": it can process 10 batches per day against a demand of 14 batches, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 4,127 s to 5,145 s, against a takt of 3,857 s. The largest loss at this step is equipment downtime (uptime 84%), about 786 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Commodities, Coffee, Cocoa & Forestry: Commodities, Coffee, Cocoa & Forestry