Box-Fermented Traceable Fine-Flavor Cocoa Bean
Product family: 7-Day Turned Cocoa Lots.
Flow: Certified Forest Farms → Pod Break & Cascading Boxes → 48h Aerobic Turn & Temp Log → Solar Tunnel Dry to 7% Moist → Cut-Test Fermentation Assay → EUDR GPS-Tagged Jute Lot → European Chocolate Makers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Pod Break & Cascading Boxes | 1,080 s | 12 min | 94% | 98.2% | 17 | 31 (0.91 d) | 45 |
| 2. 48h Aerobic Turn & Temp Log | 1,334 s | 20 min | 91% | 97.1% | 20 | 51 (1.50 d) | 34 |
| 3. Solar Tunnel Dry to 7% Moist | 1,699 s | 35 min | 84% | 95.5% | 27 | 68 (2.00 d) | 24 |
| 4. Cut-Test Fermentation Assay | 1,175 s | 15 min | 93% | 98.1% | 14 | 37 (1.09 d) | 40 |
| 5. EUDR GPS-Tagged Jute Lot | 889 s | 10 min | 97% | 99.3% | 10 | 34 (1.00 d) | 56 |
Key figures
- Takt time
- 1,588 s
- Lead time
- 8.11 d
- Value-added time
- 6,177 s
- Process cycle efficiency (PCE)
- 1.4%
- Rolled throughput yield (RTY)
- 88.7%
- Customer demand per day
- 34 tonnes
- Line capacity per day
- 24 tonnes
- Bottleneck
- Solar Tunnel Dry to 7% Moist
Reading the bottleneck
The bottleneck is "Solar Tunnel Dry to 7% Moist": it can process 24 tonnes per day against a demand of 34 tonnes, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 1,699 s to 2,118 s, against a takt of 1,588 s. The largest loss at this step is equipment downtime (uptime 84%), about 324 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commodities, Coffee, Cocoa & Forestry: Commodities, Coffee, Cocoa & Forestry
- Washed Arabica Cherry Wet-Mill & Sun-Patio Dry
- 10,000-TPD Sugar Cane Tandem Diffuser & Mill
- High-Grown Leaf Withering, Rolling & Orthodox Tea
- High-Capacity Saw Cotton Gin & 227kg Bale Press
- CTL Cut-to-Length Forest Harvester & Forwarder
- Optical Berry-Sorted Harvest Crush & Destemming
- Two-Phase Cold-Press Olive Oil Mill (25°C)
- Mobile-Bin Copper Steam Lavender Essential Oil
- Pasteurized Tunnel Substrate & Fresh Button Harvest
- Industrial Hemp Bast Fiber & Hurd Decortication
- Hevea Natural Rubber RSS3 Smoked Sheet Line