Pasteurized Tunnel Substrate & Fresh Button Harvest

Product family: 7-Day Fresh White Agaricus.

Flow: Wheat Straw & Chicken Litter → 2-Phase Tunnel Compost Cure → Climate Shelf Casing & Pinning → 3-Flush Selective Hand Pick → Instant 2°C Vacuum Cooler → Blue Tray Film Wrap & Pack → Supermarket Produce Docks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Pasteurized Tunnel Substrate & Fresh Button HarvestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Wheat Straw & Chicken Litter → 2-Phase Tunnel Compost Cure (97.0 s) → Climate Shelf Casing & Pinning (119 s) → 3-Flush Selective Hand Pick (152 s) → Instant 2°C Vacuum Cooler (105 s) → Blue Tray Film Wrap & Pack (80.0 s) → Supermarket Produce Docks.SUPPLIERWheat Straw &Chicken LitterI0.90 d12-Phase TunnelCompost CureC/T 97.0 sI1.50 d2Climate ShelfCasing & PinningC/T 119 sI2.00 d33-Flush SelectiveHand PickC/T 152 sI1.10 d4Instant 2°CVacuum CoolerC/T 105 sI1.00 d5Blue Tray FilmWrap & PackC/T 80.0 sI1.50 dCUSTOMERSupermarketProduce Docks380 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 2-Phase Tunnel Compost Cure97.0 s12 min94%98.2%190342 (0.90 d)500
2. Climate Shelf Casing & Pinning119 s20 min91%97.1%228570 (1.50 d)386
3. 3-Flush Selective Hand Pick152 s35 min84%95.5%304760 (2.00 d)271
4. Instant 2°C Vacuum Cooler105 s15 min93%98.1%152418 (1.10 d)450
5. Blue Tray Film Wrap & Pack80.0 s10 min97%99.3%114380 (1.00 d)626

Key figures

Takt time
142 s
Lead time
8.01 d
Value-added time
553 s
Process cycle efficiency (PCE)
0.13%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
380 crates
Line capacity per day
271 crates
Bottleneck
3-Flush Selective Hand Pick

Reading the bottleneck

The bottleneck is "3-Flush Selective Hand Pick": it can process 271 crates per day against a demand of 380 crates, so it falls short of demand by 28.6%. Once downtime and scrap are counted, its cycle time grows from 152 s to 189 s, against a takt of 142 s. The largest loss at this step is equipment downtime (uptime 84%), about 29.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.