High-Capacity Saw Cotton Gin & 227kg Bale Press

Product family: Strict Low Middling Lint Bales.

Flow: Round-Module Field Pickers → Module Feeder & Stick Machine → Two-Stage Heated Lint Dry → High-Speed Ribbed Saw Ginning → Auto Hydraulic 227kg Bale Strap → Standard Micronaire Tag → Ring-Spinning Textile Mills

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Capacity Saw Cotton Gin & 227kg Bale PressSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Round-Module Field Pickers → Module Feeder & Stick Machine (580 s) → Two-Stage Heated Lint Dry (716 s) → High-Speed Ribbed Saw Ginning (912 s) → Auto Hydraulic 227kg Bale Strap (631 s) → Standard Micronaire Tag (477 s) → Ring-Spinning Textile Mills.SUPPLIERRound-ModuleField PickersI0.91 d1Module Feeder &Stick MachineC/T 580 sI1.51 d2Two-Stage HeatedLint DryC/T 716 sI2.00 d3High-Speed RibbedSaw GinningC/T 912 sI1.11 d4Auto Hydraulic227kg Bale StrapC/T 631 sI1.00 d5StandardMicronaire TagC/T 477 sI1.51 dCUSTOMERRing-SpinningTextile Mills95 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Module Feeder & Stick Machine580 s12 min94%98.2%4886 (0.91 d)127
2. Two-Stage Heated Lint Dry716 s20 min91%97.1%57143 (1.51 d)97
3. High-Speed Ribbed Saw Ginning912 s35 min84%95.5%76190 (2.00 d)69
4. Auto Hydraulic 227kg Bale Strap631 s15 min93%98.1%38105 (1.11 d)114
5. Standard Micronaire Tag477 s10 min97%99.3%2995 (1.00 d)160

Key figures

Takt time
853 s
Lead time
8.06 d
Value-added time
3,316 s
Process cycle efficiency (PCE)
0.51%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
95 tonnes
Line capacity per day
69 tonnes
Bottleneck
High-Speed Ribbed Saw Ginning

Reading the bottleneck

The bottleneck is "High-Speed Ribbed Saw Ginning": it can process 69 tonnes per day against a demand of 95 tonnes, so it falls short of demand by 27.4%. Once downtime and scrap are counted, its cycle time grows from 912 s to 1,137 s, against a takt of 853 s. The largest loss at this step is equipment downtime (uptime 84%), about 174 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.