Optical Berry-Sorted Harvest Crush & Destemming
Product family: Temperature-Controlled Must.
Flow: Machine/Hand Estate Harvesters → Sorting Table MOG Leaf Removal → Gentle Pendulum Destemmer → Optical Green-Berry Jet Kick → Membrane Pneumatic Must Press → Chilled Tank Inoculation → Winery Fermentation Cellar
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Sorting Table MOG Leaf Removal | 565 s | 12 min | 94% | 98.2% | 33 | 59 (0.91 d) | 86 |
| 2. Gentle Pendulum Destemmer | 698 s | 20 min | 91% | 97.1% | 39 | 98 (1.51 d) | 66 |
| 3. Optical Green-Berry Jet Kick | 889 s | 35 min | 84% | 95.5% | 52 | 130 (2.00 d) | 46 |
| 4. Membrane Pneumatic Must Press | 615 s | 15 min | 93% | 98.1% | 26 | 72 (1.11 d) | 77 |
| 5. Chilled Tank Inoculation | 465 s | 10 min | 97% | 99.3% | 20 | 65 (1.00 d) | 108 |
Key figures
- Takt time
- 831 s
- Lead time
- 8.09 d
- Value-added time
- 3,232 s
- Process cycle efficiency (PCE)
- 0.74%
- Rolled throughput yield (RTY)
- 88.7%
- Customer demand per day
- 65 tonnes
- Line capacity per day
- 46 tonnes
- Bottleneck
- Optical Green-Berry Jet Kick
Reading the bottleneck
The bottleneck is "Optical Green-Berry Jet Kick": it can process 46 tonnes per day against a demand of 65 tonnes, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 889 s to 1,108 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 84%), about 169 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commodities, Coffee, Cocoa & Forestry: Commodities, Coffee, Cocoa & Forestry
- Washed Arabica Cherry Wet-Mill & Sun-Patio Dry
- Box-Fermented Traceable Fine-Flavor Cocoa Bean
- 10,000-TPD Sugar Cane Tandem Diffuser & Mill
- High-Grown Leaf Withering, Rolling & Orthodox Tea
- High-Capacity Saw Cotton Gin & 227kg Bale Press
- CTL Cut-to-Length Forest Harvester & Forwarder
- Two-Phase Cold-Press Olive Oil Mill (25°C)
- Mobile-Bin Copper Steam Lavender Essential Oil
- Pasteurized Tunnel Substrate & Fresh Button Harvest
- Industrial Hemp Bast Fiber & Hurd Decortication
- Hevea Natural Rubber RSS3 Smoked Sheet Line