CTL Cut-to-Length Forest Harvester & Forwarder

Product family: FSC Sawlog & Pulpwood Deck.

Flow: Certified Pine Stands → GPS Harvester Felling & Delimb → Laser Diameter Log Bucking → 8WD Forwarder Extraction Haul → Roadside Stack & Barcode Paint → Timber Truck Crane Dispatch → Sawmills & Pulp Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: CTL Cut-to-Length Forest Harvester & ForwarderSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Certified Pine Stands → GPS Harvester Felling & Delimb (141 s) → Laser Diameter Log Bucking (174 s) → 8WD Forwarder Extraction Haul (222 s) → Roadside Stack & Barcode Paint (154 s) → Timber Truck Crane Dispatch (116 s) → Sawmills & Pulp Plants.SUPPLIERCertified PineStandsI0.90 d1GPS HarvesterFelling & DelimbC/T 141 sI1.50 d2Laser DiameterLog BuckingC/T 174 sI2.00 d38WD ForwarderExtraction HaulC/T 222 sI1.10 d4Roadside Stack &Barcode PaintC/T 154 sI1.00 d5Timber TruckCrane DispatchC/T 116 sI1.50 dCUSTOMERSawmills & PulpPlants260 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. GPS Harvester Felling & Delimb141 s12 min94%98.2%130234 (0.90 d)344
2. Laser Diameter Log Bucking174 s20 min91%97.1%156390 (1.50 d)264
3. 8WD Forwarder Extraction Haul222 s35 min84%95.5%208520 (2.00 d)186
4. Roadside Stack & Barcode Paint154 s15 min93%98.1%104286 (1.10 d)307
5. Timber Truck Crane Dispatch116 s10 min97%99.3%78260 (1.00 d)432

Key figures

Takt time
208 s
Lead time
8.01 d
Value-added time
807 s
Process cycle efficiency (PCE)
0.19%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
260 tonnes
Line capacity per day
186 tonnes
Bottleneck
8WD Forwarder Extraction Haul

Reading the bottleneck

The bottleneck is "8WD Forwarder Extraction Haul": it can process 186 tonnes per day against a demand of 260 tonnes, so it falls short of demand by 28.6%. Once downtime and scrap are counted, its cycle time grows from 222 s to 277 s, against a takt of 208 s. The largest loss at this step is equipment downtime (uptime 84%), about 42.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.